One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Jay Dinesh Chemicals
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Dec 2022 |
| Application filed | 2 Dec 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jay Dinesh Chemicals |
| Land area | 2,000 m² |
| Project cost | ₹9.1 crore |
| Village / locality | Vasna Chacharavadi |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00222 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Sept 2023 | Environmental approval granted | 0.5 acres | ₹9.1 crore |
| Early planning filed 2 Dec 2022 (this page) | Cleared for impact study | 0.5 acres | ₹9.1 crore |
In context
218 applications in Ahmadabad since January 2022 are in the same category (Industry): 125 approved, 68 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is smaller than 70% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vasna Chacharavadi, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Jay Dinesh Chemicals — environmental approval granted, 0 m away
- Manufacturing Plant for 'Synthetic Organic Chemicals [API and API… — environmental approval granted, 150 m away
- Industrial project by Aceto Pharma (India) Private Limited — returned to applicant, 150 m away
- 25 mm Dia PE Gas Pipeline Connectivity Changodar to Kerala GIDC (Bavla) up to… — forest land use approved, 700 m away
- Industrial project by Baxter Pharmaceuticals India Private Limited — environmental approval granted, 750 m away
- 125mm dia. MDPE Gas pipeline Connectivity From Changodar - Kerala GIDC - Up to… — more information requested, 1.2 km away
- Proposed new manufacturing unit for Active Pharmaceutical Ingredient (API)… — cleared for impact study, 1.9 km away
- Industrial project by Bhoomi Metacast Pvt. Ltd. — cleared for impact study, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.