Quick answers
What is this project?
Proposed Expansion in Existing Facility by adding Synthetic Organic Chemicals Plant at Survey No. 31, 34, 36, 37/1, 207, 208, 209, 210, Gandhidham – Mandvi Highway, Nr. Pragpar Chokadi, Village Pragpar-1, Taluka Mundra, District Kutch, State Gujarat is an approved industrial project in Pragpar-1, Mundra, Kachchh, Gujarat. The site covers 48.8 acres.
Who is building it?
The applicant is Awl Agri Business Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Nov 2022), as of 27 Nov 2026.
Where is it?
In Pragpar-1, Mundra, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹731.3 crore and a site of 48.8 acres.
When was it filed?
The application was filed on 8 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Nov 2022 |
| Application filed | 8 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Awl Agri Business Limited |
| Land area | 48.8 acres (19.7 ha) |
| Project cost | ₹731.3 crore |
| Village / locality | Pragpar-1 |
| Taluk / tehsil | Mundra |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00261 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 48.8 acres, this one is larger than 52% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pragpar-1, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Pradipsinh Khengarji Jadeja — environmental approval granted, 2.9 km away
- AMALGAMATION OF DI PIPE FACILITIES- ECs ISSUED BY MOEF AND SEIAA TO M/S JINDAL… — environmental approval granted, 4.7 km away
- Proposed Expansion Up to 20% From Existing Plant Capacity of Blast Furnace-1&2… — environmental approval granted, 4.7 km away
- Proposed expansion up to 20% from existing plant capacity of Blast Furnace… — returned to applicant, 4.7 km away
- Gas Distribution Network — lapsed, 5.5 km away
- R S Triveni Foods Private Limited's Private Land Placed Exactly Beside the… — lapsed, 5.8 km away
- Proposed Along OFC Route Roadside Protected Forest land of Baraya to Beraja… — more information requested, 6 km away
- Shri Khalifa Rashid Amadbhai — environmental approval granted, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.