Quick answers
What is this project?
Expansion for Proposed Project Synthetic Organic Chemicals (Resin-1000 MT/Annum) Manufacturing unit of M/s. B M Plyboard Industries is an approved industrial project in Ajapar, Anjar, Kachchh, Gujarat. The site covers 3.9 acres.
Who is building it?
The applicant is B M Plyboard Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Oct 2022), as of 27 Nov 2026.
Where is it?
In Ajapar, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹4.5 crore and a site of 3.9 acres.
When was it filed?
The application was filed on 13 Oct 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Oct 2022 |
| Application filed | 13 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | B M Plyboard Industries |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹4.5 crore |
| Village / locality | Ajapar |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Village |
| Our reference | WID-GJ-00391 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.9 acres, this one is smaller than 90% of them.
Where it is
Ajapar, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion project for manufacturing of Plywood – 1250 m3/Month and… — lapsed, 1.3 km away
- Proposed expansion project for manufacturing of Plywood – 1250 m3/Month and… — cleared for impact study, 1.3 km away
- Diversion of Roadside Protected Forest Land of Anjar Nandgram Road for Lying… — forest land use approved, 1.5 km away
- Transfer of Environmental Clearance for Secondary Non-ferrous Metal Production… — environmental approval granted, 2.6 km away
- Expansion of Edible Oils Production Unit and Setting up of Proposed Stearic… — environmental approval granted, 3.4 km away
- Expansion of Edible Oils Production Unit and Setting up of Proposed Stearic… — cleared for impact study, 3.4 km away
- Proposed Expansion Project for Manufacturing of Various Synthetic Organic… — environmental approval granted, 4.3 km away
- AMENDMENT IN ENVIRONMENTAL CLEARANCE for SYNTHETIC ORGANIC CHEMICALS… — under environmental review, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.