One of 3 filings for this project. The project's main page, with every filing and where each stands: Aarya Earth
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2022 |
| Application filed | 16 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tusharkumar Patel |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹1 crore |
| Village / locality | Santhal |
| Taluk / tehsil | Mahesana |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00403 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 3 Mar 2025 | Environmental approval granted | 2.2 acres | ₹1 crore |
| Expansion filed 6 Sept 2024 | Lapsed | 2.2 acres | ₹1.7 crore |
| New project filed 16 Nov 2022 (this page) | Environmental approval granted | 2.2 acres | ₹1 crore |
In context
113 applications in Mahesana since January 2022 are in the same category (Industry): 80 approved, 25 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is smaller than 53% of them.
Where it is
Santhal, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aarya Earth — environmental approval granted, 0 m away
- Aarya Earth — lapsed, 0 m away
- Proposed Expansion of Secondary Metallurgy Plant (Alloy wheels Manufacturing… — environmental approval granted, 6.7 km away
- Proposed Expansion of Secondary Metallurgy Plant (Alloy wheels Manufacturing… — environmental approval granted, 6.7 km away
- Straightening and widening of the Mehsana - Balol - Kalri Road 0/000 - 31/600… — more information requested, 7.7 km away
- Proposed SGL 125/90/63 mm Dia MDPE Gas pipeline along and across on various… — lapsed, 7.8 km away
- Industrial project by Atoll Pharma Private Limited — initial checks, 7.9 km away
- Industrial project by Atoll Pharma Private Limited — cleared for impact study, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.