Quick answers
What is this project?
Proposed Expansion of Synthetic Organics Chemicals by M/s. Nikhil Industries is an approved industrial project in Vapi, Valsad, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is M/S. Nikhil Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Jul 2023), as of 27 Nov 2026.
Where is it?
In Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 0.2 acres.
When was it filed?
The application was filed on 13 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jul 2023 |
| Application filed | 13 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S. Nikhil Industries |
| Land area | 800 m² |
| Project cost | ₹3.5 crore |
| Village / locality | Vapi |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00408 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 98% of them.
215 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ADDITION OF PROPOSED SYNTHETIC ORGANIC CHEMICALS (APIs) IN EXISTING NON-EC… — under environmental review, 100 m away
- Proposed Project for manufacturing of API & API intermediates, speciality… — cleared for impact study, 200 m away
- Proposed Project for manufacturing of API & API intermediates, speciality… — environmental approval granted, 200 m away
- The Proposed Proposal Is for Expansion in Existing Plant Capacity of Synthetic… — cleared for impact study, 250 m away
- Proposed change in product mix with no increase in pollution load by M/s… — initial checks, 250 m away
- Proposed Expansion Project for Manufacturing of Fungicides Technical,… — environmental approval granted, 250 m away
- Proposed Expansion Project for Manufacturing of Fungicides Technical,… — cleared for impact study, 250 m away
- Industrial project by M/s. Swati Spentose Pvt. Ltd. (Unit-I) — lapsed, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.