Quick answers
What is Raj Luxuria?
Raj Luxuria is an approved building project in Devadh, Chorasi, Surat, Gujarat. The site covers 1.4 acres.
Who is building it?
The applicant is Laxmi Narayan Enterprise.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Nov 2022), as of 27 Nov 2026.
Where is it?
In Devadh, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹35 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 29 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Nov 2022 |
| Application filed | 29 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Laxmi Narayan Enterprise |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹35 crore |
| Village / locality | Devadh |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00428 |
What the filings say
What is planned
Raj Luxuria is a residential and commercial project proposed by Laxmi Narayan Enterprise in Devadh, Surat. The applicant plans to construct five high-rise buildings (Blocks A to E) with a maximum height of 44.96 metres, comprising a basement, ground floor, and 14 upper floors.
The project includes a total of 280 residential units and 18 commercial shops. The residential component is distributed across all five blocks, while the commercial shops are located on the ground floor of Blocks A, B, and E.
Building Configuration
| Component | Details |
|---|---|
| Total Buildings | 5 Blocks (A, B, C, D, E) |
| Maximum Floors | Basement + Ground + 14 Floors |
| Total Residential Units | 280 Flats |
| Total Commercial Units | 18 Shops |
| Tallest Building Height | 44.96 metres |
| Total Built-up Area | 32,760.51 square metres |
| F.S.I. Area | 21,226.87 square metres |
Layout and Design
The site layout features five distinct blocks arranged around a central internal road system. Blocks A and B are connected, while Blocks C, D, and E are standalone structures. A central common plot (C.O.P.) of 554.77 square metres is located within the site for open space.
Residential units are primarily designed as 3BHK flats. For example, in Blocks A and B, typical floors from the 1st to 14th levels contain four units per floor, each featuring a living room, kitchen/dining area, three bedrooms, and associated toilet and wash areas. The ground floor of these blocks is dedicated to parking and nine commercial shops per block.
Land and Surroundings
The project is situated on Block No. 108 (Final Plot No. 212) in Devadh, Chorasi. The total plot area is 5,525 square metres (0.55 hectares). The site is bounded by a 90-metre wide road on one side. The applicant has allocated 852.52 square metres (approximately 15.43% of the plot area) for green belt development, which includes 297.75 square metres of tree cover and 554.77 square metres of lawn area. The plan includes planting 100 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
Water, Power and Access
Water requirements for the project will be met through the local municipal supply. The applicant plans to install two percolating recharge wells for rainwater harvesting. For power, a dedicated electrical sub-station is planned on-site, and a 100 KW rooftop solar energy system is proposed, requiring 600 square metres of terrace space. Diesel Generator (DG) sets will be provided for emergency backup, located in the basement with acoustic enclosures.
Vehicular access is provided via a 6-metre wide internal road. Parking is distributed across the basement and ground levels, providing a total of 4,944.46 square metres of parking space, which exceeds the required 4,386.86 square metres.
Environmental Safeguards
The project includes a 175 kilolitres per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) occupying 70 square metres. Domestic sewage will be treated and discharged into the Surat Municipal Corporation (SMC) drainage system. For solid waste, an automatic Organic Waste Converter (OWC) with a capacity of 400 kg/day is planned.
The environmental management budget is estimated at ₹2.52 crore for capital costs and ₹20.70 lakh for annual recurring costs. This includes provisions for dust mitigation, noise control, and fire safety systems as per municipal fire department opinions.
Timeline
The applicant's project report states that the entire project is expected to be completed within approximately four years. Installation of environmental management units will proceed in parallel with the construction phases.
Raj Luxuria site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 60% of them.
59 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devadh, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sky Antilia — environmental approval granted, 150 m away
- Shivanta Celebration — environmental approval granted, 250 m away
- Raj Enclave — lapsed, 250 m away
- Raj Paradise — environmental approval granted, 250 m away
- Raj Paradise — environmental approval granted, 250 m away
- Sky Heaven — environmental approval granted, 300 m away
- PROPOSED EXPANSION IN CONSTRUCTION OF "RESIDENTIAL PROJECT - Madhav Hills" AT… — environmental approval granted, 550 m away
- Sky Blossom — environmental approval granted, 700 m away