Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

AMC EWS Housing Project

AMC EWS Housing Project is an approved building project in Oganaj, Daskroi, Ahmadabad, Gujarat. The site covers 8.2 acres. Its stated project cost is ₹241.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Nov 2022).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since4 Nov 2022
Application filed4 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAhmedabad Municipal Corporation
Land area8.2 acres (3.3 ha)
Project cost₹241.4 crore
Village / localityOganaj
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00463

What the filings say

What is planned

The Ahmedabad Municipal Corporation (AMC) proposes to develop an Economically Weaker Section (EWS) housing project in Oganaj, Ahmedabad. The applicant's project report describes a residential complex consisting of 14 blocks, designated as Block 1 to Block 14.

The project is planned to include a total of 2,100 residential units. According to the layout plans, the buildings are designed with a ground floor plus 14 upper floors. The ground floor of each block is primarily dedicated to parking (hollow plinth). In addition to the residential blocks, the site will feature an Anganwadi (childcare centre) and a security cabin.

Layout and design

The site layout is organized around a series of internal 9.0-metre and 6.0-metre wide roads. Each residential block is designed with multiple lifts, including dedicated 8-person and 12-person capacity elevators. Refuge areas are planned on the 5th, 8th, and 12th floors of the buildings for fire safety.

The project incorporates several common amenities and utilities:

Water, power and access

During the construction phase, water will be sourced from the AMC water supply. For the operation phase, the total wastewater generation is estimated at 900 kilolitres per day (KLD). The applicant proposes to recycle 450 KLD of this water, while the remaining 450 KLD will be discharged into the existing AMC drainage line. A Moving Bed Biofilm Reactor (MBBR) type Sewage Treatment Plant (STP) with a capacity of 925 KLD is planned.

To manage stormwater, the design includes nine percolating wells for rainwater harvesting and groundwater recharge. Power will be supplied by the local grid, with a Diesel Generator (DG) set planned as a secondary source for use during power failures. The DG set will be equipped with acoustic enclosures and a stack height of at least 3.0 metres from ground level to mitigate noise and air emissions.

Environmental safeguards

The Environment Management Plan (EMP) outlines several mitigation measures:

ItemDetail
Total Residential Units2,100
Number of Blocks14
Tallest Building HeightGround + 14 Floors
Total Built-up Area1,43,340.09 sq. m.
STP Capacity925 KLD
Solar Power Capacity470 KW
Tree Plantation826 numbers
Rainwater Recharge Wells9 numbers

AMC EWS Housing Project site plan and layout

3 drawings from the project's filings. Sign in free to see them.

AMC EWS Housing Project: Site layout plan: 14 residential blocks, internal roads, and common plots (preview)🔒 Sign in free to see it
Site layout plan: 14 residential blocks, internal roads, and common plots
AMC EWS Housing Project: Parking layout plan showing car and two-wheeler spaces (preview)🔒 Sign in free to see it
Parking layout plan showing car and two-wheeler spaces
AMC EWS Housing Project: Satellite view of the project location with boundary coordinates (preview)🔒 Sign in free to see it
Satellite view of the project location with boundary coordinates

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8.2 acres, this one is larger than 91% of them.

210 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Oganaj, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ahmedabad Municipal Corporation in Ahmadabad

All 11 Ahmedabad Municipal Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.