Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Nov 2022 |
| Application filed | 4 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ahmedabad Municipal Corporation |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹241.4 crore |
| Village / locality | Oganaj |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00463 |
What the filings say
What is planned
The Ahmedabad Municipal Corporation (AMC) proposes to develop an Economically Weaker Section (EWS) housing project in Oganaj, Ahmedabad. The applicant's project report describes a residential complex consisting of 14 blocks, designated as Block 1 to Block 14.
The project is planned to include a total of 2,100 residential units. According to the layout plans, the buildings are designed with a ground floor plus 14 upper floors. The ground floor of each block is primarily dedicated to parking (hollow plinth). In addition to the residential blocks, the site will feature an Anganwadi (childcare centre) and a security cabin.
Layout and design
The site layout is organized around a series of internal 9.0-metre and 6.0-metre wide roads. Each residential block is designed with multiple lifts, including dedicated 8-person and 12-person capacity elevators. Refuge areas are planned on the 5th, 8th, and 12th floors of the buildings for fire safety.
The project incorporates several common amenities and utilities:
- Common Plots: Five distinct common plots totaling 4,257.30 square metres.
- Green Space: A total green space area of 2,350.78 square metres, including a planned plantation of 826 trees.
- Parking: A total parking area of 11,252.51 square metres is provided, including 5,084.66 square metres for cars and 5,174.10 square metres for two-wheelers. Dedicated parking spaces for persons with disabilities are included.
- Renewable Energy: A rooftop solar energy system with a capacity of 470 KW is planned, requiring 2,820.65 square metres of terrace space.
Water, power and access
During the construction phase, water will be sourced from the AMC water supply. For the operation phase, the total wastewater generation is estimated at 900 kilolitres per day (KLD). The applicant proposes to recycle 450 KLD of this water, while the remaining 450 KLD will be discharged into the existing AMC drainage line. A Moving Bed Biofilm Reactor (MBBR) type Sewage Treatment Plant (STP) with a capacity of 925 KLD is planned.
To manage stormwater, the design includes nine percolating wells for rainwater harvesting and groundwater recharge. Power will be supplied by the local grid, with a Diesel Generator (DG) set planned as a secondary source for use during power failures. The DG set will be equipped with acoustic enclosures and a stack height of at least 3.0 metres from ground level to mitigate noise and air emissions.
Environmental safeguards
The Environment Management Plan (EMP) outlines several mitigation measures:
- Air Quality: Water sprinkling on haul roads and covering transportation vehicles with tarpaulin during construction to control dust.
- Noise Control: Use of acoustic enclosures for machinery, periodic maintenance of vehicles, and provision of personal protective equipment (PPE) like ear muffs for workers in high-noise areas.
- Solid Waste: Construction debris will be sorted and used for filling low-lying areas on-site. During operation, a door-to-door collection system will be used. Organic waste will be processed using an automatic Organic Waste Converter (OWC) with a capacity of 2,000 kg per day.
- Fire Safety: The project includes a fire hydrant system, wet risers, fire extinguishers on each floor, and an underground water tank of 1,00,000 litres dedicated to fire safety, supplemented by a 20,000-litre terrace tank.
| Item | Detail |
|---|---|
| Total Residential Units | 2,100 |
| Number of Blocks | 14 |
| Tallest Building Height | Ground + 14 Floors |
| Total Built-up Area | 1,43,340.09 sq. m. |
| STP Capacity | 925 KLD |
| Solar Power Capacity | 470 KW |
| Tree Plantation | 826 numbers |
| Rainwater Recharge Wells | 9 numbers |
AMC EWS Housing Project site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8.2 acres, this one is larger than 91% of them.
210 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Oganaj, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Festival O2 — environmental approval granted, 150 m away
- The Festival Vibes — environmental approval granted, 250 m away
- Kan Residency — environmental approval granted, 650 m away
- Prastav Healthcare — environmental approval granted, 850 m away
- Swastik Stellar — under environmental review, 900 m away
- Wertical Epsilon — initial checks, 950 m away
- Aditya Heights — environmental approval granted, 950 m away
- Madhav One — environmental approval granted, 950 m away
More from Ahmedabad Municipal Corporation in Ahmadabad
- Environmental Clearance for proposed Ahmedabad City Square located Opposite… — initial checks
- Environmental Clearance for Development in Buffer Zone of Closed TSDF Facility… — under environmental review
- Slum Rehabilitation Scheme — environmental approval granted
- Environmental Clearance for Proposed Urban House (Public Institutional… — more information requested
- AMC Housing Project — lapsed
- Waste management project by M/s. Ahmedabad Municipal Corporation — environmental approval granted
All 11 Ahmedabad Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.