What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Sakar Prime

Sakar Prime is an approved building project in Zundal, Gandhinagar, Gujarat. The site covers 1.3 acres. Its stated project cost is ₹44 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Aug 2023).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Sakar Prime?

Sakar Prime is an approved building project in Zundal, Gandhinagar, Gujarat. The site covers 1.3 acres.

Who is building it?

The applicant is Satva and Sakar Project.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 23 Aug 2023), as of 27 Nov 2026.

Where is it?

In Zundal, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹44 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 23 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since23 Aug 2023
Application filed23 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSatva and Sakar Project
Land area1.3 acres (0.5 ha)
Project cost₹44 crore
Village / localityZundal
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00504

What the filings say

What is planned

Satva and Sakar Project proposes to develop Sakar Prime, a residential and commercial project in Zundal, Gandhinagar. The applicant's project report states that the development will consist of 190 residential units and 29 commercial units. The total built-up area is planned at 33,964.91 square metres on a net plot area of 5,199 square metres.

Project Components

ItemDetail
Total Built-up Area33,964.91 sq.m.
Total FSI Area18,413.07 sq.m.
Residential Units190
Commercial Units29
Estimated Population896 (760 residential, 136 commercial)
Total Parking Area6,821.01 sq.m.
Greenbelt Area794.55 sq.m.

Layout and design

The project is designed as a high-rise development. According to the conceptual plans, the structure will include two basement levels for parking. The commercial component is located on the ground floor, while residential units occupy the upper floors. The design incorporates a dual plumbing system for the reuse of treated water in flushing and gardening.

Parking is planned across multiple levels, including two basements, a hollow plinth, and open areas. The total parking provision is 243 Equivalent Car Spaces (ECS), which exceeds the requirement of 122 Car Parking Spaces (CPS) calculated under National Building Code (NBC) norms.

Water, power and access

During the operational phase, the total water demand is estimated at 112.7 kilolitres per day (KLD). Of this, 72.9 KLD will be fresh water supplied by the Gandhinagar Municipal Corporation (GMC), and 39.9 KLD will be recycled from treated sewage. For the construction phase, approximately 9 KLD of water will be sourced via tankers.

Power requirements are estimated at 1,250 KW, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). A single diesel generator set with a capacity of 125 KVA is planned for emergency backup.

The site is accessible via 30-metre and 36-metre wide Town Planning Scheme (TPS) roads. Internal approach roads within the premises will be 6.0 metres wide. The nearest railway station is Khodiyar, located 2.79 km away, and Ahmedabad airport is approximately 9.24 km from the site.

Environmental safeguards

The applicant proposes an onsite Sewage Treatment Plant (STP) to treat 92.4 KLD of generated sewage. Treated water will be reused for flushing and gardening, with the surplus discharged into the GMC drainage line. For solid waste management, an Organic Waste Converter will be used for biodegradable waste, while non-recyclable waste will be collected by the municipal body. The project plans to provide 28 collection bins.

To manage storm water, two percolation wells are proposed for groundwater recharging. The greenbelt will cover 794.55 square metres, including a 534.55 square metre lawn and 260 square metres for trees. Approximately 130 trees of local species such as Neem, Ashoka, and Jambu are planned for the periphery.

Energy conservation measures include the use of LED lighting, solar street lights, and solar water heaters. The applicant has allocated 40% of the terrace area for solar panels. The estimated capital cost for environmental management is ₹1.79 crore, with an annual recurring cost of ₹8.87 lakh.

Sakar Prime site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Sakar Prime: Master plan: building footprint, internal roads, and parking layout (preview)🔒 Sign in free to see it
Master plan: building footprint, internal roads, and parking layout
Sakar Prime: Site location: coordinates and surrounding features (preview)🔒 Sign in free to see it
Site location: coordinates and surrounding features
Sakar Prime: Water balance chart for construction and operation phases (preview)🔒 Sign in free to see it
Water balance chart for construction and operation phases
Sakar Prime: Distance from nearest airport and bearing details (preview)🔒 Sign in free to see it
Distance from nearest airport and bearing details

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 59% of them.

125 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Zundal, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.