What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Rajkot, Gujarat

Residential Cum Commercial Project Sattva Prime proposed by Lotus Developers

Residential Cum Commercial Project Sattva Prime proposed by Lotus Developers is an approved building project in Mavdi, Rajkot, Gujarat. The site covers 1.2 acres. Its stated project cost is ₹26.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Nov 2023).

See it on the live map All projects in Rajkot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since1 Nov 2023
Application filed1 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantLotus Developers
Land area1.2 acres (0.5 ha)
Project cost₹26.5 crore
Village / localityMavdi
Taluk / tehsilRajkot
DistrictRajkot
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00551

What the filings say

Lotus Developers proposes to develop Sattva Prime, a residential and commercial project in the Mavdi area of Rajkot. The project is planned on a net plot area of 4,183.25 square metres (approximately 1.03 acres) out of a total plot area of 5,049.69 square metres.

What is planned

The development consists of three distinct building blocks (DW-3 and M1) providing a mix of residential units, showrooms, and offices. The project includes a high-rise residential component and commercial spaces across various floor levels.

Building Components

Floor Distribution

The buildings reach a maximum height of 14 floors above ground level. The area distribution is as follows:

Layout and Design

The site layout features a central common plot of 506.07 square metres (10% of the net plot area) designated for green space. The buildings are arranged to provide internal pathways and a 1.80-metre wide passage. The project includes a 6 KV rooftop solar photovoltaic system for renewable energy generation.

Architectural plans specify the use of a frame structure. The design incorporates natural ventilation for public areas and building orientation intended to maximize daylight. Acoustic enclosures are planned for Diesel Generator (DG) sets to limit noise to 75 dB(A) at a 1-metre distance.

Land and Surroundings

The project site is located near Sanskar Sanidhy in Mavdi, Rajkot. It is bordered by existing survey numbers (R.S. No. 74, 71 P 2, and 71 P 3) and is adjacent to a proposed 24-metre wide Town Planning (TP) road and a 30-metre wide road edge. A portion of the land (95.81 square metres) is designated for DP cutting.

Water, Power and Access

Water management includes a dual plumbing system to promote the reuse of treated water. The applicant proposes:

Environmental Safeguards

The Environment Management Plan (EMP) outlines measures for both construction and operation phases:

Lotus Developers Residential Cum Commercial Project Sattva Prime Proposed site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Lotus Developers Residential Cum Commercial Project Sattva Prime Proposed: Site plan showing building footprints, common plot, and road access (preview)🔒 Sign in free to see it
Site plan showing building footprints, common plot, and road access
Lotus Developers Residential Cum Commercial Project Sattva Prime Proposed: Typical floor plans for residential units (2nd to 13th floors) and elevation (preview)🔒 Sign in free to see it
Typical floor plans for residential units (2nd to 13th floors) and elevation
Lotus Developers Residential Cum Commercial Project Sattva Prime Proposed: Commercial layout: Showrooms and office floor plans for floors 1 through 6 (preview)🔒 Sign in free to see it
Commercial layout: Showrooms and office floor plans for floors 1 through 6
Lotus Developers Residential Cum Commercial Project Sattva Prime Proposed: Ground floor and basement parking layout (preview)🔒 Sign in free to see it
Ground floor and basement parking layout

In context

134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.2 acres, this one is smaller than 78% of them.

79 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mavdi, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 6 Lotus Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.