Quick answers
What is Santvan Rizon?
Santvan Rizon is an approved building project in Palanpor, Majura, Surat, Gujarat. The site covers 1.1 acres.
Who is building it?
The applicant is Jayesh Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Apr 2023), as of 27 Nov 2026.
Where is it?
In Palanpor, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹47 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 12 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Apr 2023 |
| Application filed | 12 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jayesh Patel |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹47 crore |
| Village / locality | Palanpor |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00615 |
What the filings say
What is planned
Santvan Rizon is a proposed residential high-rise project by Jayesh Patel and others. According to the applicant's conceptual plan, the development will consist of three residential buildings (Blocks A, B, and C) on a plot of 0.45 hectares (1.11 acres). Each building is designed with two basements, a hollow plinth, and 21 floors above ground, reaching a maximum height of 66.35 metres.
The project will provide a total of 244 residential units. Planned amenities for the society include a clubhouse, a garden with a jogging park, and a children's play area. The total built-up area for the project is 32,206.92 square metres.
| Item | Detail |
|---|---|
| Number of Buildings | 3 |
| Total Residential Units | 244 |
| Tallest Building Height | 66.35 m |
| Floors | 2 Basements + Hollow Plinth + 21 Floors |
| Total Built-up Area | 32,206.92 sq. mt. |
| FSI Area | 17,799.80 sq. mt. |
| Expected Residents | 600 |
Layout and design
The three blocks are arranged in a linear layout along the site. Block A and Block C are situated at the ends, with Block B in the centre. The ground level includes a common plot area of 445.30 square metres.
Parking is distributed across multiple levels to accommodate 299 Equivalent Car Spaces (ECS). This includes 214 spaces in the basements, 38 spaces in the hollow plinth, and 47 spaces on the first floor. The design incorporates 60 electric vehicle charging points. Access to the buildings is provided via two entry and exit points on 15-metre and 18-metre wide Town Planning (TP) roads.
Water, power and access
During the operation phase, the total water consumption is estimated at 173 kilolitres per day (KLD). Fresh water requirement of 103 KLD will be sourced from the Surat Municipal Corporation (SMC). The remaining 70 KLD will be met through recycled water for flushing (68 KLD) and gardening (2 KLD).
The electrical load demand for the complex is estimated at 1,300 KW, to be supplied by Dakshin Gujarat Vij Company Limited (DGVCL). For energy conservation, the applicant proposes to install 241 solar panels with a capacity of 130 KW on the rooftops to power common area lighting and water pumps. Two silent diesel generator sets of 125 KVA each are planned for emergency backup.
Environmental safeguards
A Sewage Treatment Plant (STP) with a capacity of 150 KLD using Moving Bed Biofilm Reactor (MBBR) technology will be installed. Treated sewage will be reused for flushing and gardening, with any excess discharged into the SMC drainage line.
For solid waste management, an Organic Waste Convertor (OWC) with a capacity of 300 kg per day will process kitchen waste into manure for use on-site. Inorganic waste will be collected in bins and disposed of through the SMC municipal waste collection system. Rainwater harvesting will be implemented through two percolation wells to recharge ground water. The project includes a green belt of 500 square metres, where 75 trees of species such as Gulmohar, Jambu, and Limdo will be planted.
Timeline
The applicant submitted a notarized undertaking stating that no construction activity had started at the site as of March 2023. The project is expected to be implemented over a five-year period, with budgetary provisions for environmental management recurring annually after the initial construction phase.
Santvan Rizon site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 77% of them.
94 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palanpor, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Samarthya Enorme — environmental approval granted, 50 m away
- Residential Building Project by Jay Patel — environmental approval granted, 350 m away
- "residential Cum Commercial Project- Altura" by M/S. 127 Buildhomes LLP at… — environmental approval granted, 450 m away
- Euphoria — environmental approval granted, 600 m away
- Residential Building Project by Chandrakant Patel — environmental approval granted, 600 m away
- Building project by EWS -II "Pradhan Mantri Awas Yojana" Surat Municipal… — environmental approval granted, 750 m away
- Sanctum Palacio — environmental approval granted, 750 m away
- Residential Cum Commercial Building Project by Samarth Builders — environmental approval granted, 750 m away
More from Jayesh Patel in Surat