Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Feb 2023 |
| Application filed | 6 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sanmag Buildcon LLP |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹27.7 crore |
| Village / locality | Ambli |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00617 |
What the filings say
What is planned
According to the project documents, Sanmag Buildcon LLP proposes to develop a residential complex named "Sankalp Gwala" in Ambli, Ahmedabad. The project is planned to consist of four building blocks with varying heights. Blocks A, B, and C are designed to include a basement, a ground floor or hollow plinth, and 10 upper floors. Block D is proposed to have a basement, a ground floor or hollow plinth, and 7 upper floors.
The development is intended to provide a total of 146 residential units, all of which are specified as 3 BHK (three-bedroom, hall, and kitchen) apartments. The total built-up area for the project is 22,244.08 square metres, while the Floor Space Index (FSI) area is 13,125.92 square metres. The total land area for the project is 0.49 hectares (1.21 acres).
Layout and design
The project layout features a basement level equipped with mechanical ventilation. Parking facilities are distributed across the basement (3,830.18 square metres), the hollow plinth (1,764.48 square metres), and open surface areas (350 square metres). This provides a total parking area of 5,944.66 square metres, intended to accommodate 197 Car Parking Spaces (CPS).
Internal movement is facilitated by a 6.0-metre-wide approach road. The site plan includes two common plots: Common Plot-1 (253.66 square metres) and Common Plot-2 (244.56 square metres). Fire safety provisions include fire extinguishers, hose reels, wet risers, and an automatic sprinkler system in the basement and hollow plinth. Refuge areas are planned for the 6th and 8th floors of the taller blocks.
Water, power and access
During the construction phase, the total water requirement is estimated at 19.5 kilolitres per day (KLD), which includes 4.5 KLD for domestic use by workers, 5 KLD for dust suppression, and 10 KLD for construction and curing. This will be met through tankers.
For the operational phase, the total water demand is projected at 125.24 KLD. The applicant plans to source 85 KLD of fresh water from the Ahmedabad Municipal Corporation (AMC), while the remaining 40.24 KLD will be met through treated wastewater. The project will generate approximately 98.4 KLD of wastewater, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 125 KLD. Treated water will be recycled for flushing and gardening.
Power will be supplied by the local grid, with a 62.5 KVA Diesel Generator (DG) set provided for emergency backup. The project also incorporates a 52 KW solar power generation system for common area lighting.
Environmental safeguards
The applicant has earmarked 498.22 square metres for a green belt, which will include the plantation of 123 trees. The green belt design follows a two-phase approach: the first phase involves planting evergreen and fast-growing trees at 3.0-metre intervals, and the second phase adds trees with larger canopies at 6.0-metre intervals.
For solid waste management, an Organic Waste Convertor (OWC) will be installed to treat biodegradable waste. Recyclable inorganic waste will be segregated and sold to vendors. Stormwater management includes two percolation wells for rainwater harvesting to recharge ground water.
Land and surroundings
A geotechnical investigation report by KBM Engineering Research Laboratory describes the site as having generally uneven ground. Subsurface exploration through two test bores drilled to a depth of 15 metres revealed soil layers consisting of loose dark brown sandy silt with clay, followed by stiff to dense silty sand and fine sand with silt, and hard brown clayey silt at deeper levels. The ground water table was not encountered within the 15-metre drilling depth. The report recommends isolated column footings at a depth of 5 to 7 metres.
| Item | Detail |
|---|---|
| Total Residential Units | 146 (3 BHK) |
| Total Built-up Area | 22,244.08 sq. m. |
| FSI Area | 13,125.92 sq. m. |
| Total Parking Area | 5,944.66 sq. m. |
| STP Capacity | 125 KLD |
| Solar Power Capacity | 52 KW |
| Green Belt Area | 498.22 sq. m. |
| Number of Trees | 123 |
Sankalp Gwala site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.
307 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambli, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Orchid Finsbury — environmental approval granted, 350 m away
- Aaravi Arete — environmental approval granted, 400 m away
- Vertical Vue — environmental approval granted, 400 m away
- Shaligram Parkland — environmental approval granted, 550 m away
- Divyam Astra — under environmental review, 650 m away
- One Cent — environmental approval granted, 650 m away
- One Cent — environmental approval granted, 650 m away
- Param Nest — environmental approval granted, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.