What is Residential Building Project by Dobariya Developers?
This approved building project by Dobariya Developers is in Pal, Majura, Surat, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Dobariya Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Mar 2023), as of 27 Nov 2026.
Where is it?
In Pal, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹50.5 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 17 Mar 2023.
Project details
| Official title | Residential Building Project |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Mar 2023 |
| Application filed | 17 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dobariya Developers |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹50.5 crore |
| Village / locality | Pal |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00704 |
What the filings say
What is planned
The applicant, Dobariya Developers, proposes a residential building project comprising three buildings divided into five blocks. According to the project documents, each building will rise to 13 floors above a basement and a hollow plinth. The development is designed to provide 130 residential units.
Infrastructural features planned for the site include a children's play area, a garden with a jogging park, and a clubhouse for the society. The total built-up area is specified as 29,806.11 square metres.
Layout and design
The project layout allocates space for residential use and common amenities. The total proposed parking area is 5,266.02 square metres, providing 170 Equivalent Car Spaces (ECS). This includes 131 spaces in the basement and 39 spaces in the hollow plinth area. The buildings are designed with a maximum height of 44.90 metres.
| Item | Detail |
|---|---|
| Total Plot Area | 5,949.00 sq. mt. |
| Total Built-up Area | 29,806.11 sq. mt. |
| Number of Buildings | 3 |
| Total Blocks | 5 |
| Residential Units | 130 |
| Maximum Building Height | 44.90 metres |
| Total Parking Provided | 170 ECS |
Land and surroundings
The project is located at Block No. 9, Final Plot No. 9 in the Preliminary Town Planning Scheme No. 15 (Pal), Surat. The site is situated on 0.59 hectares (1.458 acres) of private residential land at an elevation of 28 metres above mean sea level. The applicant states the site is approximately 7.76 km from the Surat railway station and 7.99 km from the Surat airport. The project is adjacent to the Surat Municipal Corporation (SMC) limits.
Water, power and access
During the operation phase, the total water requirement is estimated at 94 kilolitres per day (KLD). This includes a fresh water demand of 55 KLD, to be sourced from the SMC, and 39 KLD of recycled water. During the construction phase, the water requirement is expected to be 15 KLD.
Wastewater generation is expected to be 73 KLD. The applicant proposes to install a Sewage Treatment Plant (STP) with a capacity of 90 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Of the treated effluent, 39 KLD will be recycled for flushing and gardening, while the remaining 34 KLD will be discharged into the SMC drainage system.
The electrical load demand is estimated at 700 KW, to be supplied by Dakshin Gujarat Vij Company Limited (DGVCL). For emergency backup, two silent diesel generator sets of 125 KVA each are proposed. Energy conservation measures include the installation of a 70 KW solar power system for common area lighting and the use of LED fixtures.
Environmental safeguards
The applicant plans to develop a green belt covering 600 square metres (0.148 acres), which represents approximately 10% of the plot area. A total of 95 trees are proposed to be planted, including species such as Gulmohar, Jambu, and Limdo.
For solid waste management, the project will generate approximately 260 kg of waste per day. Organic waste, estimated at 100 kg per day, will be treated on-site using an organic waste converter to produce manure for landscaping. Inorganic waste will be collected and disposed of through the SMC municipal system. The rainwater harvesting system will include two recharge wells to manage storm water runoff from the roof and paved areas.
Timeline
The total project cost is estimated at ₹50.48 crore. The applicant has submitted an undertaking stating that no construction activity had started at the site as of March 2023.
Dobariya Developers Residential Building site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is smaller than 53% of them.
115 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pal, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Building Project by Bhupatbhai Mavani — environmental approval granted, 200 m away
- Aurevia — under environmental review, 700 m away
- Vedant Bella Vista — environmental approval granted, 750 m away
- Residential Building Project by Snehalbhai Patel — environmental approval granted, 750 m away
- Residential Building Project by Jayesh Patel — environmental approval granted, 800 m away
- Sangini Prominence & Sangini Urbania — environmental approval granted, 850 m away
- Residential Building Project by Pramukh Gauravpath Realty LLP — more information requested, 850 m away
- Samarthya One — initial checks, 1000 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.