What is Developing? Open the mapMap

Environmental approval grantedIndustry · Bhavnagar, Gujarat

Proposed Active Pharmaceutical Ingredient (API) manufacturing unit of M/s. Depth Medicare at Sihor GIDC, Gujarat

Proposed Active Pharmaceutical Ingredient (API) manufacturing unit of M/s. Depth Medicare at Sihor GIDC, Gujarat is an approved industrial project in Sihor (M), Sihor, Bhavnagar, Gujarat. The site covers 1.3 acres. Its stated project cost is ₹24.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Sept 2023).

See it on the live map All projects in Bhavnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Active Pharmaceutical Ingredient (API) manufacturing unit of M/s. Depth Medicare at Sihor GIDC, Gujarat is an approved industrial project in Sihor (M), Sihor, Bhavnagar, Gujarat. The site covers 1.3 acres.

Who is building it?

The applicant is Depth Medicare.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 2 Sept 2023), as of 27 Nov 2026.

Where is it?

In Sihor (M), Sihor, Bhavnagar, Gujarat.

How big is it?

It has a stated cost of ₹24.5 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 2 Sept 2023.

Project details

StatusEnvironmental approval granted
Status since2 Sept 2023
Application filed2 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantDepth Medicare
Land area1.3 acres (0.5 ha)
Project cost₹24.5 crore
Village / localitySihor (M)
Taluk / tehsilSihor
DistrictBhavnagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00809

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Sept 2023 (this page)Environmental approval granted1.3 acres₹24.5 crore
Early planning filed 17 May 2023Cleared for impact study1.3 acres₹24.5 crore

In context

34 applications in Bhavnagar since January 2022 are in the same category (Industry): 18 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.3 acres, this one is smaller than 97% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sihor (M), Sihor, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.