Quick answers
What is National Industries (Unit 3)?
National Industries (Unit 3) is a lapsed industrial project in Gabheni, Majura, Surat, Gujarat. The site covers 1.2 acres.
Who is building it?
The applicant is Jayaben Chalodiya.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Gabheni, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹18.1 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 15 Jul 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 15 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jayaben Chalodiya |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹18.1 crore |
| Village / locality | Gabheni |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00816 |
In context
103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.2 acres, this one is smaller than 64% of them.
67 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gabheni, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- No increase in Pollution Load Application of M/s. Prakhar Estates Private… — initial checks, 200 m away
- No increse in Pollution Load Application of M/s. Prakhar Estates Private… — initial checks, 200 m away
- No increase in Pollution Load Application of M/s. Gautam Industrial… — initial checks, 200 m away
- No increase in Pollution Load Application of M/s. Gautam Industrial… — initial checks, 200 m away
- Proposed change in product mix by M/s. SHAKTI DISTILLERIES PVT. LTD. Located… — initial checks, 250 m away
- Industrial project by M/s. Aether Industries Limited (Unit-3) — initial checks, 300 m away
- M/S. Aether Industries Limited: Proposed Amendment in existing EC for addition… — environmental approval granted, 300 m away
- M/s. Acutaas Chemicals Limited (Unit-4) proposes a new project of Synthetic… — cleared for impact study, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.