One of 2 filings for this project. The project's main page, with every filing and where each stands: Gujarat Fluorochemicals LTD. Proposed Expansion by Increasing the Existing Production…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Jun 2023 |
| Application filed | 22 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gujarat Fluorochemicals Limited-Dahej Complex |
| Land area | 127.1 acres (51.4 ha) |
| Project cost | ₹3,469.6 crore |
| Village / locality | Ambheta |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00876 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Dec 2023 | Environmental approval granted | 127.1 acres | ₹3,469.6 crore |
| Early planning filed 22 Jun 2023 (this page) | Cleared for impact study | 127.1 acres | ₹3,469.6 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 127.1 acres, this one is larger than 93% of them.
209 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambheta, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gujarat Fluorochemicals LTD. Proposed Expansion by Increasing the Existing… — environmental approval granted, 0 m away
- Application for Amendment in Consent to Establish with Change in Product Mix… — initial checks, 450 m away
- Change of Product Mix on the basis of No increase in Pollution Load by M/s.… — initial checks, 550 m away
- Expansion in synthetic organic chemicals manufacturing by M/s Deepak Phenolics… — environmental approval granted, 550 m away
- Expansion in synthetic organic chemicals manufacturing by M/s Deepak Phenolics… — cleared for impact study, 550 m away
- Industrial project by M/s. NOCIL Limited. — under environmental review, 550 m away
- Industrial project by M/s. NOCIL Limited. — cleared for impact study, 550 m away
- Project by M/s. NOCIL LTD. — initial checks, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.