What is Developing? Open the mapMap

Environmental approval grantedIndustry · Valsad, Gujarat

Proposed Project for the Manufacturing of Fungicides Technical, Insecticides Technical, Herbicides Technical & Pesticides Intermediates by M/S Cropnosys India PVT. LTD.

Proposed Project for the Manufacturing of Fungicides Technical, Insecticides Technical, Herbicides Technical & Pesticides Intermediates by M/S Cropnosys India PVT. LTD is an approved industrial project in Vapi, Valsad, Gujarat. The site covers 2.4 acres. Its stated project cost is ₹193 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Oct 2023).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project for the Manufacturing of Fungicides Technical, Insecticides Technical, Herbicides Technical & Pesticides Intermediates by M/S Cropnosys India PVT. LTD is an approved industrial project in Vapi, Valsad, Gujarat. The site covers 2.4 acres.

Who is building it?

The applicant is Cropnosys (India) Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Oct 2023), as of 27 Nov 2026.

Where is it?

In Vapi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹193 crore and a site of 2.4 acres.

When was it filed?

The application was filed on 28 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since17 Oct 2023
Application filed28 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantCropnosys (India) Private Limited
Land area2.4 acres (1 ha)
Project cost₹193 crore
Village / localityVapi
Taluk / tehsilVapi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00877

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 23 Nov 2023Cleared for impact study2.4 acres₹193 crore
New project filed 28 Aug 2023 (this page)Environmental approval granted2.4 acres₹193 crore

In context

283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.4 acres, this one is larger than 58% of them.

222 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Cropnosys (India) Private Limited in Valsad

All 3 Cropnosys projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.