Quick answers
What is Limestone Mining Project, Survey No.- 20/P?
Limestone Mining Project, Survey No.- 20/P is a lapsed mining project in Aniali, Ranavav, Porbandar, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Rameshbhai Keshwala.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Aniali, Ranavav, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 21 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rameshbhai Keshwala |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Aniali |
| Taluk / tehsil | Ranavav |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00881 |
In context
144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Aniali, Ranavav, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rana Vadvala Chalk Mining Project, Survey No 580 & 581/2, Proposed by Shri… — lapsed, 4.2 km away
- Bharat Uka Karavadra — returned to applicant, 7.5 km away
- Amar Black Trap Block-B Area-01.50.00 Ha. proposed by Manishbhai Lilabhai… — lapsed, 7.6 km away
- Amar Black Trap Block-C Area of 01.14.92 ha. proposed by Modhvadiya Pratap… — lapsed, 7.6 km away
- Modhvadiya Pratap Lilabhai — returned to applicant, 7.6 km away
- Manishbhai Lilabhai Modhvadiya — withdrawn, 7.6 km away
- Approach Road to Connect Proposed Iocl Petrol Pump Along… — more information requested, 7.7 km away
- Diversion of 0.75696 -hectare forest land for Laying of 66KV S/C Kutiyana –… — under forest review, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.