Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Aug 2023 |
| Application filed | 24 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | D Y Pharma |
| Land area | 2,100 m² |
| Project cost | ₹5 crore |
| Village / locality | Indrad |
| Taluk / tehsil | Kadi |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00962 |
In context
113 applications in Mahesana since January 2022 are in the same category (Industry): 80 approved, 25 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.5 acres, this one is smaller than 89% of them.
60 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Indrad, Kadi, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shivanku Chem Tech — initial checks, 50 m away
- Project for Manufacturing of Various Insecticides for Veterinary Animal Health… — environmental approval granted, 100 m away
- Matrix Pharma Chem — more information requested, 150 m away
- Matrix Pharma Chem — withdrawn, 150 m away
- Industrial project by Krishnaa Biosynth LLP — environmental approval granted, 250 m away
- Proposed Project for Manufacturing of Various Insecticides for Veterinary… — environmental approval granted, 250 m away
- Proposed Project for Manufacturing of Various Insecticides for Veterinary… — returned to applicant, 250 m away
- Proposed Project for Manufacturing of Various Insecticides for Veterinary… — returned to applicant, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.