Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vasuki Cement Private Limited |
| Land area | 8.1 acres (3.3 ha) |
| Project cost | ₹84 crore |
| Village / locality | Varsamedi |
| Taluk / tehsil | Maliya |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01043 |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.1 acres, this one is larger than 83% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Varsamedi, Maliya, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cement Grinding Unit (OPC)/PPC/PSC - 1.98 MTPA) at Survey No. 133,… — lapsed, 0 m away
- Proposed Cement Grinding Unit (OPC/PPC/PSC - 1.19 MTPA) at Survey No. 133 &… — lapsed, 50 m away
- Proposed Cement Grinding Unit (OPC/ PPC/ PSC/ Composite Cement/ Sulphate… — environmental approval granted, 50 m away
- Proposed Cement Grinding Unit (OPC/ PPC/ PSC/ Composite Cement/ Sulphate… — cleared for impact study, 50 m away
- 66KV D/C Motadahisara (132KV) - Varshamedi (Navlakhi) line with 66KV… — forest land use approved, 2.9 km away
- Conversion of 37 Ha Forest Land for Slatpan — not approved, 5.2 km away
- Resurfacing & Strengthening of Amaran-Fadsar-Zinzuda Road Km. 0/0 to… — more information requested, 6.9 km away
- 4-lane Greenfield Highway from Maliya to Pipaliya (missing link of… — cleared for impact study, 7.7 km away
More from Vasuki Cement Private Limited in Morbi
- Proposed Cement Grinding Unit (OPC/ PPC/ PSC/ Composite Cement/ Sulphate… — environmental approval granted
- Proposed Cement Grinding Unit (OPC/ PPC/ PSC/ Composite Cement/ Sulphate… — cleared for impact study
- Proposed Cement Grinding Unit (OPC/PPC/PSC - 1.19 MTPA) at Survey No. 133 &… — lapsed
- Proposed Cement Grinding Unit (OPC)/PPC/PSC - 1.98 MTPA) at Survey No. 133,… — lapsed
All 5 Vasuki Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.