What is The Taurus?
The Taurus is an approved building project in Khoraj, Gandhinagar, Gujarat. The site covers 2 acres.
Who is building it?
The applicant is Parshiv Infra LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Nov 2023), as of 27 Nov 2026.
Where is it?
In Khoraj, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹96 crore and a site of 2 acres.
When was it filed?
The application was filed on 8 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Nov 2023 |
| Application filed | 8 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Parshiv Infra LLP |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹96 crore |
| Village / locality | Khoraj |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01126 |
What the filings say
What is planned
Parshiv Infra LLP proposes to develop a building construction project named "The Taurus" in Khoraj, Gandhinagar. The applicant's project report describes a mixed-use development comprising residential and commercial components. The project is planned on a plot area of 8,082.00 square metres (2.00 acres) with a total built-up area of 54,614.98 square metres.
The residential portion is designed to accommodate 152 units, intended for approximately 760 persons. The commercial segment is planned with a floor area of 5,254.13 square metres, intended for an estimated 525 persons. The tallest building structure is planned to reach 14 floors above ground level.
| Item | Detail |
|---|---|
| Total Plot Area | 8,082.00 square metres |
| Total Built-up Area | 54,614.98 square metres |
| Total FSI Area | 33,266.44 square metres |
| Residential Units | 152 units |
| Estimated Population | 1,285 persons |
| Total Parking Area | 10,968.92 square metres |
| Green Belt Area | 1,353.82 square metres |
| Power Requirement | 1,500 KW |
Layout and design
The layout includes two main blocks (Block A and Block B) with two levels of basement parking. The ground floor is designed to house commercial shops and residential entrance foyers. Upper floors are dedicated to residential flats. The design incorporates a common plot of 949.82 square metres, exceeding the required 808.20 square metres.
Parking is distributed across the hollow plinth and two basement levels. According to the parking summary, the project provides 350 Equivalent Car Spaces (ECS), which includes 155 spaces in Basement 1 and 152 spaces in Basement 2, with the remainder in open and hollow plinth areas.
Land and surroundings
The project site is located at Final Plot No. 99/2 in Khoraj, within the limits of the Gandhinagar Municipal Corporation (GMC). The land is currently undeveloped. The nearest transport links are the Khodiyar Railway Station, located approximately 2.68 km away, and Ahmedabad Airport, about 10 km from the site. The applicant states that the project area falls under Seismic Zone III, indicating a medium probability of earthquake shocks.
Water, power and access
During the operational phase, the total water demand is estimated at 133.0 kilolitres per day (KLD). Of this, 84.6 KLD will be fresh water sourced from the GMC water supply, while 48.4 KLD will be recycled from treated sewage for flushing and gardening. For construction, 9.0 KLD will be required, sourced via tankers.
Power requirement is estimated at 1,500 KW, to be supplied by Uttar Gujarat Vij Company Limited (UGVCL). A 125 KVA diesel generator set is planned for emergency backup. Access to the premises will be provided through 18.0-metre and 30.0-metre wide roads, with 6.0-metre wide internal approach roads.
Environmental safeguards
The applicant proposes to install an on-site Sewage Treatment Plant (STP) to treat 107.3 KLD of sewage. Treated water will be reused for flushing and landscaping, with the surplus discharged into the GMC drainage line. For solid waste, the project will generate an estimated 511 kg per day, including 307 kg of wet waste and 205 kg of dry waste. Biodegradable waste is planned to be processed in an Organic Waste Converter.
To manage storm water and recharge ground water, three percolation wells are proposed. The green belt will cover 1,353.82 square metres, including a 949.82 square metre lawn and 404 square metres for trees, with a plan to plant 202 trees. Energy conservation measures include the use of LED lighting, solar street lights, and architectural designs that maximize natural light and ventilation. Fire safety provisions include a 20,000-litre terrace tank for each building, fire extinguishers, and a sprinkler system in the basements.
The Taurus site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is larger than 74% of them.
114 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khoraj, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dharohar — initial checks, 200 m away
- Shashwat Evana — environmental approval granted, 250 m away
- Trogon Centre Court — environmental approval granted, 450 m away
- Divyam Arcais — under environmental review, 450 m away
- The Richland — under environmental review, 450 m away
- Shivalik Wave — environmental approval granted, 500 m away
- Shivalik Wave — environmental approval granted, 500 m away
- Shivalik Wave — environmental approval granted, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.