Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Feb 2023 |
| Application filed | 11 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Metabolt Energy Private Limited |
| Land area | 46.9 acres (19 ha) |
| Project cost | ₹110 crore |
| Village / locality | Siludi |
| Taluk / tehsil | Valia |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01164 |
In context
58 applications in Bharuch since January 2022 are in the same category (Buildings & townships): 34 approved, 12 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 46.9 acres, this one is larger than 77% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Siludi, Valia, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manufacturing plant of Single Super Phosphate (SSP) / Granular Single Super… — lapsed, 4.4 km away
- Construct of Approach Road (entry and exit) for set up Adinath Petroleum on… — lapsed, 5.2 km away
- Submission of Forest Land Proposal for Diversion of Social Forest Land of… — forest land use approved, 7.1 km away
- Transmission line from 132 KV Bharuch substation to Ankleshwar TSS Bay for… — withdrawn, 7.2 km away
- Project by Intas Pharmaceuticals LTD — initial checks, 7.3 km away
- Celebration Luxuria — lapsed, 7.4 km away
- Celebration Luxuria — environmental approval granted, 7.4 km away
- Yogi Heights — environmental approval granted, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.