Quick answers
What is this project?
Padali Building Limestone Mining Project, Survey no. 343 Paiki, Proposed by by Shree Rambhai Vikrambhai Mer is an approved mining project in Padli, Okhamandal, Devbhumi Dwarka, Gujarat. The site covers 4 acres.
Who is building it?
The applicant is Shree Rambhai Vikrambhai Mer.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jul 2023), as of 27 Nov 2026.
Where is it?
In Padli, Okhamandal, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 4 acres.
When was it filed?
The application was filed on 23 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jul 2023 |
| Application filed | 23 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shree Rambhai Vikrambhai Mer |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Padli |
| Taluk / tehsil | Okhamandal |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01234 |
In context
171 applications in Devbhumi Dwarka since January 2022 are in the same category (Mining): 103 approved, 44 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4 acres, this one is smaller than 66% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 27.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Padli, Okhamandal, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Merkhi Ranabhai Parmar — environmental approval granted, 150 m away
- Shri Merkhi Ranabhai Parmar — cleared for impact study, 150 m away
- Shri Astha Jyotindrasinh Vala — environmental approval granted, 300 m away
- Shri Astha Jyotindrasinh Vala — cleared for impact study, 300 m away
- Shri Nayan K. Goraniya — environmental approval granted, 350 m away
- Shri Nayan K Goraniya (Padli Building Limestone Block-A Lease area- 1.39.28 Ha.) — cleared for impact study, 400 m away
- Shri Moon Ramesh Jivabhai — environmental approval granted, 450 m away
- Shri Moon Ramesh Jivabhai — cleared for impact study, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.