Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Swarnim Paradise

Swarnim Paradise is an approved building project in Vavol, Gandhinagar, Gujarat. The site covers 1.8 acres. Its stated project cost is ₹36.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Jan 2023).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Swarnim Paradise?

Swarnim Paradise is an approved building project in Vavol, Gandhinagar, Gujarat. The site covers 1.8 acres.

Who is building it?

The applicant is Bhaskar Patel.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 30 Jan 2023), as of 27 Nov 2026.

Where is it?

In Vavol, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹36.4 crore and a site of 1.8 acres.

When was it filed?

The application was filed on 30 Jan 2023.

Project details

StatusEnvironmental approval granted
Status since30 Jan 2023
Application filed30 Jan 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantBhaskar Patel
Land area1.8 acres (0.7 ha)
Project cost₹36.4 crore
Village / localityVavol
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01250

What the filings say

What is planned

Swarnim Paradise is a residential and commercial project proposed by Bhaskar Patel in Vavol, Gandhinagar. The applicant's project report describes a development consisting of three main building blocks: Block A for commercial use and Blocks D and E for residential use.

The project is designed to reach a maximum height of 45 metres above ground level. Block A is planned as a commercial building with a ground floor and six upper floors. Blocks D and E are residential towers consisting of a hollow plinth (ground level) and 14 upper floors. The development also includes two basement levels for parking and services.

The project will provide a total of 195 units, comprising 156 residential apartments and 39 commercial shops or offices. The residential units are distributed across the 14 floors of Blocks D and E, while the 39 commercial units are located within Block A.

Project Components

ItemDetail
Total Units195 (156 Residential, 39 Commercial)
Building Blocks3 (Block A, Block D, Block E)
Max Floors14 (Residential) / 6 (Commercial)
Basement Levels2
Total Built-up Area28,672.00 sq. m.
Total FSI Area21,243.30 sq. m.
Common Plot Area967.20 sq. m.

Layout and design

The layout plan shows Block A positioned at the front of the site facing an 18-metre wide Town Planning (TP) road. Blocks D and E are situated behind Block A, separated by internal driveways. Two common plots are designated within the premises: Common Plot-1 (596.20 sq. m.) and Common Plot-2 (371.00 sq. m.).

Internal access is provided via 7.50-metre wide roads within the site. The residential towers (Blocks D and E) feature a central foyer on each floor, with four lifts serving the blocks, including dedicated fire lifts. The commercial block (Block A) includes passages of 2.50 metres in width and multiple lift shafts.

Water, power and access

During the operation phase, the applicant states that water will be supplied by the Gandhinagar Municipal Corporation (GMC). The project includes an onsite sewage treatment plant (STP) with a capacity of 130 kilolitres per day (KLD) using the Activated Sludge Process. Treated water will be reused for gardening and toilet flushing, with any excess discharged into the GMC drainage line.

Power will be sourced from the local grid, supported by a Diesel Generator (DG) set for emergency backup. Energy conservation measures include the installation of a 67.82 kW rooftop solar system and the use of LED lighting in common areas. Rainwater harvesting will be implemented through two percolation wells.

Parking is planned across the two basement levels and at the surface level. The basements feature driveways ranging from 3.40 metres to 8.90 metres in width to facilitate vehicle movement.

Environmental safeguards

The Environmental Management Plan (EMP) outlines a capital expenditure of ₹2.23 crore for environmental protection. This includes ₹30 lakh for the STP, ₹50 lakh for fire and safety systems, and ₹33.91 lakh for solar energy infrastructure.

Dust mitigation during construction will involve 10-metre high wind-breakers, water sprinkling, and tarpaulin covers for transport vehicles. For solid waste, an organic waste converter (OWC) with a capacity of 350 kg per day will be installed to treat wet waste, which will then be used as compost for the greenbelt. The greenbelt is planned to include 180 trees and lawn areas.

Under Corporate Environmental Responsibility (CER), the applicant proposes to spend ₹73 lakh on providing solar panels and rainwater harvesting structures at local primary schools in Vavol and Gandhinagar sectors, as well as the beautification of Vavol and Kolvada lakes.

Timeline

The project's implementation plan for capital expenditure indicates a construction period spanning from 2023-24 to 2025-26, with the majority of the environmental infrastructure spending scheduled for the final year.

Swarnim Paradise site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Swarnim Paradise: Site layout: commercial and residential blocks, roads and common plots (preview)🔒 Sign in free to see it
Site layout: commercial and residential blocks, roads and common plots
Swarnim Paradise: Front elevation and cross-section showing 14 floors and basements (preview)🔒 Sign in free to see it
Front elevation and cross-section showing 14 floors and basements
Swarnim Paradise: Basement plans: parking layout, driveways and utility tanks (preview)🔒 Sign in free to see it
Basement plans: parking layout, driveways and utility tanks
Swarnim Paradise: Typical floor plans for residential blocks D and E (preview)🔒 Sign in free to see it
Typical floor plans for residential blocks D and E

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 67% of them.

68 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vavol, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information