One of 2 filings for this project. The project's main page, with every filing and where each stands: Shri Dixitkumar Shankarbhai Kavadiya (Tithva Black Trap Block- A Mine Lease Area:…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 Feb 2025 |
| Application filed | 4 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dixitkumar Kavadiya |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Tithava |
| Taluk / tehsil | Wankaner |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01309 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 4 Oct 2024 (this page) | Returned to applicant | 4.3 acres | ₹3.1 crore |
| New project filed 11 Aug 2024 | Environmental approval granted | 4.3 acres | ₹3.1 crore |
In context
263 applications in Morbi since January 2022 are in the same category (Mining): 184 approved, 24 filed or under review, and 55 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.3 acres, this one is smaller than 51% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 21.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Tithava, Wankaner, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Dixitkumar Shankarbhai Kavadiya (Tithva Black Trap Block- A Mine Lease… — environmental approval granted, 0 m away
- Shri Dixitkumar Shankarbhai Kavadiya — cleared for impact study, 0 m away
- Dixitkumar Shankerbhai Kavadiya (Tithva Black Trap Block- D) — under environmental review, 100 m away
- Shri Bhoraniya Ilmudin Aminbhai — environmental approval granted, 450 m away
- Mathkiya Ramzanali Usmanbhai — environmental approval granted, 500 m away
- Gadara Nanjibhai Pragajibhai -Block - B — lapsed, 800 m away
- Shri Kagathra Dipak Narbherambhai Reapprasial Area-1.0000Govt land & Survey… — environmental approval granted, 900 m away
- Shri Mathakiya Ibrahimbhai Usmanbhai — lapsed, 900 m away
More from Dixitkumar Kavadiya in Morbi
- Dixitkumar Shankerbhai Kavadiya (Tithva Black Trap Block- D) — under environmental review
- Shri Dixitkumar Shankarbhai Kavadiya — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.