Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sampad Project |
| Land area | 3,800 m² |
| Project cost | ₹35 crore |
| Village / locality | Motera |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01354 |
What the filings say
What is planned
The applicant, M/s. Sampad Project, proposes to develop a residential affordable housing project named 'Sampad Primero' in Motera. The project consists of three residential blocks—Block A, Block B, and Block C—each rising to 14 floors above a ground-level hollow plinth.
The development will provide a total of 140 residential units. According to the tenement and floor area tables, each of the 14 floors will accommodate 10 units across the three blocks. The project also includes two basement levels, referred to as cellars, dedicated to parking and utilities.
| Item | Detail |
|---|---|
| Total Residential Units | 140 |
| Number of Blocks | 3 |
| Floors Above Ground | 14 Floors + Hollow Plinth |
| Basement Levels | 2 |
| Total Water Demand | 78.5 KLD |
| Sewage Treatment Plant Capacity | 75 KLD |
| Solar Power Capacity | 81 kW |
| EV Charging Points | 25 |
| Greenbelt Coverage | 14.6% |
Layout and design
The site layout features a central common plot of 391.62 square metres (0.09 acres). The ground floor is designed as a hollow plinth to facilitate parking and includes meter rooms and a club house area of 14.54 square metres. Each block is equipped with two lifts, including designated fire lifts.
The two basement levels provide extensive space for car and two-wheeler parking. A total parking area of 5,856.81 square metres is planned across the ground level and basements to accommodate residents and visitors.
Water, power and access
The project's total water requirement is estimated at 78.5 kilolitres per day (KLD). The applicant plans to source 45.2 KLD of fresh water from the Ahmedabad Municipal Corporation (AMC) supply, while the remaining 33.3 KLD will be met through recycled water for flushing and gardening.
A Sewage Treatment Plant (STP) with a capacity of 75 cubic metres per day will be installed on-site. The plant will utilize Membrane Bioreactor (MBR) technology for secondary and tertiary treatment. Treated sewage will be reused, with any surplus (approximately 34.7 KLD) discharged into the AMC drainage line.
For power, the project will rely on the common electricity grid. The applicant proposes to install solar photo-voltaic panels on 900 square metres of rooftop area, which is expected to generate 81 kW of energy. Additionally, the project will feature electric vehicle (EV) charging infrastructure with 25 charging points and a dedicated power provision of 150 kW from the common supply.
Environmental safeguards
The environmental management plan specifies a greenbelt development covering 560 square metres, representing 14.6% of the total plot area. This includes 360 square metres of lawn and 200 square metres of tree-covered area. Recommended species for plantation include Neem, Gulmohar, Peepal, and Karanj.
Solid waste generation is projected at 280 kg per day during the operational phase. The applicant plans to segregate waste into organic and inorganic components. Organic waste will be processed on-site using an Organic Waste Composter (OWC) with a capacity of 120 kg per day, producing manure for the greenbelt. For rainwater management, one percolation well will be constructed to recharge the groundwater.
Corporate Environmental Responsibility
The applicant has earmarked ‑70.2 lakhs (2% of the project cost) for Corporate Environmental Responsibility (CER) activities to be implemented over five years. Planned initiatives include the redevelopment of the Koteshwar village pond (covering 15,000 square metres), greenbelt development surrounding the lake, and the installation of 150 solar street lights in Koteshwar village.
Residential Project 'SAMPAD PRIMERO' site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 88% of them.
50 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Motera, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- AMC Housing Project FP 65 TP 47 Motera Koteshwar — lapsed, 100 m away
- AMC Housing Project — lapsed, 100 m away
- Shyam Zircon — environmental approval granted, 500 m away
- Residiential Plus Commercial Project by Bulsons Corporation LLP — environmental approval granted, 600 m away
- North Palace — lapsed, 850 m away
- North Palace — environmental approval granted, 850 m away
- Proposed Expansion in EC for Commercial Project - "EMPORIS" by Aarush Spaces… — environmental approval granted, 850 m away
- NOVUS- Business Park — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.