One of 3 filings for this project. The project's main page, with every filing and where each stands: EXPANSION FOR PROPOSED PROJECT Synthetic Organic Chemicals (Resin) Manufacturing unit OF…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jul 2023 |
| Application filed | 22 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Auralam Laminates LLP |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹20.2 crore |
| Village / locality | Juna Sadulka |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01355 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 30 Jul 2024 | Environmental approval granted | 7.7 acres | ₹20.2 crore |
| Expansion filed 24 Feb 2024 | Environmental approval granted | 10.3 acres | ₹20.2 crore |
| Early planning filed 22 Jul 2023 (this page) | Cleared for impact study | 10.3 acres | ₹20.2 crore |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.3 acres, this one is larger than 89% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Juna Sadulka, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EXPANSION FOR PROPOSED PROJECT Synthetic Organic Chemicals (Resin)… — environmental approval granted, 0 m away
- No Increase in Pollution Load Application for Resin manufacturing plant of… — initial checks, 150 m away
- No Increase in Pollution Load Application for Resin manufacturing plant of… — initial checks, 150 m away
- Industrial project by Transfer of EC of M/s. Sarvottam Decor Private Limited — environmental approval granted, 150 m away
- EXPANSION FOR PROPOSED PROJECT Synthetic Organic Chemicals (Resin)… — environmental approval granted, 300 m away
- Expansion for existing Formaldehyde and Resin unit and proposed API unit of… — returned to applicant, 500 m away
- Diversion of 0.044 Hectare of Protected Forest Land for laying 125 MM dia. PE… — forest land use approved, 600 m away
- PROPOSED EXPANSION PROJECT OF FORMALDEHYDE RESIN(PHENOL, MELAMINE & UREA) by… — environmental approval granted, 2.1 km away
All 3 Auralam Laminates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.