Quick answers
What is Hilltown Lavish?
Hilltown Lavish is an approved building project in Kudasan, Gandhinagar, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Kesari Infra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Dec 2023), as of 27 Nov 2026.
Where is it?
In Kudasan, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹63 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 26 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Dec 2023 |
| Application filed | 26 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kesari Infra |
| Land area | 3,600 m² |
| Project cost | ₹63 crore |
| Village / locality | Kudasan |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-01364 |
What the filings say
What is planned
Kesari Infra proposes to develop "Hilltown Lavish," a combined residential and commercial building project in Kudasan, Gandhinagar. According to the applicant's project reports, the development is planned on a plot area of 0.36 hectares (0.89 acres) with a total built-up area of 24,332.32 square metres.
The project consists of three blocks (Block A, B, and C) with a maximum height of 13 floors above ground level. The unit distribution includes:
- Residential units: 122 apartments
- Commercial units: 24 shops
- Total units: 146 units
Block A and B are planned as a combined structure, while Block C is a separate wing. The ground floor and first floor are designated for commercial use (mercantile), while the upper floors from the second to the thirteenth are reserved for residential dwellings. The project also includes two basement levels for parking and services.
Layout and design
The site layout features a common plot of 359.45 square metres. Internal circulation is provided by 6.00-metre and 9.00-metre wide internal roads. The building design incorporates hollow parking areas on the ground level and double-height foyers for the residential blocks.
Vertical circulation is managed by six lifts, including dedicated fire lifts. The commercial section includes shops of varying sizes, with the largest shops (Shop No. 1 and 10) measuring approximately 16.71 x 4.70 metres. Each commercial unit is provided with individual toilet facilities.
Land and surroundings
The project is located at Survey No. 417 (Final Plot No. 18/2) in Kudasan, within the limits of the Gandhinagar Municipal Corporation. The site is currently open land and does not involve the clearance of existing vegetation or buildings. The nearest railway station is Gandhinagar, located approximately 7.70 km away, while the Ahmedabad Airport is about 10.00 km from the site. The project is bordered by an 80.00-metre wide Development Plan (DP) road.
Water, power and access
Water for the project will be sourced from the Gandhinagar Municipal Corporation (GMC), primarily utilizing Narmada water. The applicant states that if groundwater extraction becomes necessary, permission will be sought from the Central Ground Water Authority (CGWA).
Power will be supplied by Uttar Gujarat Vij Company Limited (UGVCL). The estimated power demand is 30 kW during the construction phase and approximately 2.00 MW during the operational phase. Access to the site is provided via the existing 80.00-metre wide road and an 18.00-metre wide Town Planning (TP) road.
Environmental safeguards
The applicant has planned several environmental management measures:
- Waste Management: Municipal solid waste will be segregated into dry and wet waste. Wet waste is intended to be converted to manure using an organic waste converter for use as a soil conditioner on-site. Construction debris will be used for levelling low-lying areas.
- Water Management: Sewage will be treated in an on-site Sewage Treatment Plant (STP). Treated water is planned for use in flushing and gardening, with any surplus discharged into the GMC drainage line. One percolating well is proposed for rainwater harvesting.
- Green Belt: A tree plantation plan is included, requiring 90 trees based on the norm of 5 trees per 200 square metres of plot area.
- Energy: The project plans to include a solar water heating system and rooftop solar energy installations as per building regulations.
Key Figures
| Item | Detail |
|---|---|
| Total Built-up Area | 24,332.32 sq. m. |
| Plot Area | 3,589.32 sq. m. |
| Residential Units | 122 |
| Commercial Units | 24 |
| Total Units | 146 |
| Maximum Floors | G + 13 |
| Common Plot Area | 359.45 sq. m. |
| Operational Power Demand | 2.00 MW |
| Proposed Trees | 90 |
Hilltown Lavish site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 91% of them.
176 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kudasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Akshardham Iconic — environmental approval granted, 50 m away
- Akshardham Iconic — withdrawn, 50 m away
- Akshardham Iconic — environmental approval granted, 50 m away
- Sagar Veronica — environmental approval granted, 50 m away
- Verdana — environmental approval granted, 100 m away
- The Sky Scape — environmental approval granted, 200 m away
- Sankalp Abhijat — under environmental review, 200 m away
- Pratibimb — environmental approval granted, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.