Quick answers
What is this project?
Expansion of mining in 90.5279 Ha.Laterite (Survey no. 184, 185, 286, 290, 299, & 300) and 65.3971 Ha. Bauxite (Survey No. 185, 286, 290, & 299) Mining Leases At: Village – Palakhada, District Porbandar, Gujarat State is an approved mining project in Keshav, Porbandar, Gujarat. The site covers 223.7 acres.
Who is building it?
The applicant is Saurashtra Minerals Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Apr 2025), as of 27 Nov 2026.
Where is it?
In Keshav, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹13.3 crore and a site of 223.7 acres.
When was it filed?
The application was filed on 31 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Apr 2025 |
| Application filed | 31 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Saurashtra Minerals Private Limited |
| Land area | 223.7 acres (90.5 ha) |
| Project cost | ₹13.3 crore |
| Village / locality | Keshav |
| Taluk / tehsil | Porbandar |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01475 |
In context
144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 223.7 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Keshav, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.61768 ha Social Forest land for Laying of 66KV S/C… — lapsed, 2.1 km away
- Permission for Laying Ug Drinking Water Pipeline in Various Road Side Forest… — lapsed, 2.6 km away
- Mer Vastabhai Devshibhai — not approved, 2.8 km away
- Rambhai Savadasbhai Chauhan — returned to applicant, 3 km away
- Rambhai Savdasbhai Chauhan — not approved, 3 km away
- Pratapbhai Arbhambhai Karavadra — returned to applicant, 3.1 km away
- Devabhai Bhimabhai Modhavadiya — environmental approval granted, 3.1 km away
- Bhanubhai Arjanbhai Khuti & Keshvala Bhanubhai Ranmalbhai — not approved, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.