One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed new project for manufacturing of Synthetic Organic Chemical by M/s. Mercury…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Feb 2023 |
| Application filed | 14 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mercury Organics |
| Land area | 900 m² |
| Project cost | ₹2 crore |
| Village / locality | Nandesari |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01562 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2023 | Environmental approval granted | 0.2 acres | ₹2 crore |
| Early planning filed 14 Feb 2023 (this page) | Cleared for impact study | 0.2 acres | ₹2 crore |
In context
178 applications in Vadodara since January 2022 are in the same category (Industry): 91 approved, 71 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 99% of them.
92 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandesari, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed new project for manufacturing of Synthetic Organic Chemical by M/s.… — environmental approval granted, 0 m away
- Public facility by M/s. Kalki Healthcare Private Limited — initial checks, 100 m away
- Industrial project by M/s. RK DYESTUFF — lapsed, 150 m away
- Industrial project by M/s. RK DYESTUFF — returned to applicant, 150 m away
- Industrial project by M/s. RK DYESTUFF — cleared for impact study, 150 m away
- Industrial project by M/s. NARAYAN ORGANICS PVT. LTD. — withdrawn, 150 m away
- Industrial project by M/s. NARAYAN ORGANICS PVT. LTD. — cleared for impact study, 150 m away
- Industrial project by M/s. NARAYAN ORGANICS PVT. LTD. — cleared for impact study, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.