Quick answers
What is Sahjanand Luxuria?
Sahjanand Luxuria is an approved building project in Jahangirabad, Majura, Surat, Gujarat. The site covers 2.3 acres.
Who is building it?
The applicant is Hari Krishna Engineering Corporation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Feb 2023), as of 27 Nov 2026.
Where is it?
In Jahangirabad, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹78.9 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 11 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Feb 2023 |
| Application filed | 11 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hari Krishna Engineering Corporation |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹78.9 crore |
| Village / locality | Jahangirabad |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01574 |
What the filings say
What is planned
The applicant, Hari Krishna Engineering Corporation, proposes to develop a residential cum commercial project named Sahjanand Luxuria. According to the conceptual plan, the project will consist of four buildings divided into eight blocks. Two buildings (four blocks) are designated for residential cum commercial use, while the other two buildings (four blocks) are purely residential.
Each building is designed with two basements, a hollow plinth, and 14 floors above ground, reaching a maximum height of 45 metres. The project will provide a total of 437 residential units and 56 commercial units. The residential units are planned as a mix of 2 BHK and 3 BHK apartments. Infrastructural features include a clubhouse, a garden with a jogging park, and a children's play area.
Layout and design
The total plot area is 9,417 sq. mt. (0.94 hectares), with a total built-up area of 60,293 sq. mt. The Floor Space Index (FSI) area is 37,210.84 sq. mt. The ground coverage is planned at 3,631.58 sq. mt.
| Item | Detail |
|---|---|
| Total Built-up Area | 60,293 sq. mt. |
| Residential Units | 437 |
| Commercial Units | 56 |
| Maximum Building Height | 45 m |
| Total Parking Area | 14,283.15 sq. mt. |
| Parking Capacity (CPS) | 464 |
| STP Capacity | 300 KLD |
Land and surroundings
The project is located on private residential land at Jahangirabad in Surat. The site coordinates are 21°13'52.06"N latitude and 72°46'42.12"E longitude. The applicant states that the site is approximately 7.05 km from Surat railway station and 12.83 km from Surat airport. There are no national parks, wildlife sanctuaries, or ecologically sensitive areas within a 10 km radius of the site.
Water, power and access
During the operation phase, the total water requirement is estimated at 322 kilolitres per day (KLD). This includes 191 KLD of fresh water to be supplied by the Surat Municipal Corporation (SMC) and 131 KLD of recycled water. The project is expected to generate 254 KLD of sewage.
The total electrical load demand is estimated at 2,500 KW, to be sourced from Dakshin Gujarat Vij Company Limited (DGVCL). For emergency backup, the applicant proposes to install three silent diesel generator sets with a capacity of 125 KVA each. Energy conservation measures include the installation of a 150 KW solar power system for common area lighting and the use of LED fixtures.
Access to the site will be provided through two gates from adjacent public roads, which are 45 metres and 16 metres wide.
Environmental safeguards
The applicant proposes to treat sewage in an on-site Sewage Treatment Plant (STP) with a capacity of 300 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be recycled for flushing (126 KLD) and gardening (5 KLD), with the remaining 123 KLD discharged into the SMC drainage line.
For solid waste management, an Organic Waste Convertor (OWC) with a capacity of 400 kg per day will be installed to process wet waste into manure. Dry waste will be collected in bins and disposed of through the SMC waste collection system. The green belt development will cover 1,000 sq. mt. (0.10 hectares or 0.25 acres), where 160 trees of species such as Gulmohar, Jambu, and Ashopalav will be planted. Rainwater harvesting will be managed through three recharge wells.
The project report notes that as per the EIA notification, a formal Environmental Impact Assessment and public consultation are not required for this category of project.
Sahjanand Luxuria site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.3 acres, this one is larger than 73% of them.
65 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jahangirabad, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Anand Aspire — environmental approval granted, 150 m away
- Devshree Iconic — environmental approval granted, 650 m away
- Laxmi Viva — environmental approval granted, 650 m away
- Swicon Sky — environmental approval granted, 700 m away
- Residential Building Project by Vinod Bharodia — environmental approval granted, 750 m away
- Proposed Project of "Construction of Residential Cum Commercial Project Gran… — more information requested, 800 m away
- Ramji Vatika — environmental approval granted, 800 m away
- Residential Building Project by Ramji Corporation — environmental approval granted, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.