Quick answers
What is this project?
Proposed Expansion of Dyes and Dye Intermediate Manufacturing Unit by M/s. Gopinath Chemtech Ltd. Unit-II is a proposed industrial project in Dhanot, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 3.3 acres.
Who is building it?
The applicant is Gopinath Chem Tech Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Nov 2023), as of 27 Nov 2026.
Where is it?
In Dhanot, Kalol Gandhinagar, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹52.9 crore and a site of 3.3 acres.
When was it filed?
The application was filed on 3 Nov 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Nov 2023 |
| Application filed | 3 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gopinath Chem Tech Limited |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹52.9 crore |
| Village / locality | Dhanot |
| Taluk / tehsil | Kalol Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01642 |
In context
97 applications in Gandhinagar since January 2022 are in the same category (Industry): 70 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.3 acres, this one is larger than 77% of them.
72 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhanot, Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Dyes and Dye Intermediates Manufacturing Unit by M/s. Gopinath… — returned to applicant, 0 m away
- Industrial project by Asian Tubes Pvt Ltd. — under environmental review, 300 m away
- Industrial project by M/s. Shri Laxmi Chem Pharma Private Limited — environmental approval granted, 700 m away
- Industrial project by M/s. Shri Laxmi Chemicals — environmental approval granted, 700 m away
- Industrial project by M/s. Shri Laxmi Chemicals — cleared for impact study, 700 m away
- Industrial project by M/s. Nand Chemicals – Unit 2 — environmental approval granted, 950 m away
- Industrial project by M/s. Nand Chemicals – Unit 2 — cleared for impact study, 950 m away
- Transfer of Environment Clearance for Synthetic Organic chemicals… — environmental approval granted, 950 m away
More from Gopinath Chem Tech Limited in Gandhinagar
- Expansion of Dyes and Dye Intermediates Manufacturing Unit by M/s. Gopinath… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.