One of 2 filings for this project. The project's main page, with every filing and where each stands: Alabhya
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Mar 2023 |
| Application filed | 4 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Aadhya Shakti Buildcon |
| Land area | 2,800 m² |
| Project cost | ₹25.5 crore |
| Village / locality | Bhadaj |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01652 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 8 Nov 2023 | Environmental approval granted | 0.7 acres | ₹28.5 crore |
| New project filed 4 Mar 2023 (this page) | Environmental approval granted | 0.7 acres | ₹25.5 crore |
What the filings say
What is planned
Aadhya Shakti Buildcon proposes the construction of a residential project named "ALABHYA" in Bhadaj, Ahmedabad. The project report describes a high-rise residential building consisting of a single block. The structure is planned to have three basements, a ground floor (hollow plinth for parking), and 21 upper floors.
The development is designed to accommodate 42 residential units. The total built-up area is stated as 23,717.85 square metres, with a total Floor Space Index (FSI) area of 13,382.90 square metres.
| Item | Detail |
|---|---|
| Total Land Area | 2,842.00 square metres (0.70 acres) |
| Total Built-up Area | 23,717.85 square metres |
| Total FSI Area | 13,382.90 square metres |
| Residential Units | 42 |
| Building Configuration | 3 Basements + Ground Floor + 21 Floors |
| Total Parking Area | 4,999.11 square metres |
| Greenbelt Area | 832.97 square metres |
Layout and design
The building design incorporates a hollow plinth area for parking and circulation. The site layout includes a common plot of 688.97 square metres. Internal approach roads within the premises are planned to be 6.0 metres wide, with the main entry provided from a 36-metre wide Town Planning Scheme (TPS) road.
Vertical circulation is managed through four lifts, including one designated as a fire lift. The project includes a dedicated fire hydrant system with an underground water tank of 40 kilolitres (KL) and a terrace tank of 20 KL. The building is designed to be earthquake-resistant as per Seismic Zone III norms.
Land and surroundings
The project is located at Final Plot No. 125/1/1 in Bhadaj, within the Ahmedabad Municipal Corporation (AMC) limits. The topography of the site is plain. Geotechnical investigations involving a 30-metre deep borehole identified sub-surface strata consisting of silty clay, sandy silt, and clayey sand. The ground water table was not encountered during the investigation conducted in January 2023.
Water, power and access
During the operational phase, the total water requirement is estimated at 38.2 kilolitres per day (KLD). Of this, 22.8 KLD will be fresh water sourced from the AMC, while 15.4 KLD will be met through recycled treated sewage. For the construction phase, approximately 9.0 KLD of water will be required, to be supplied via tankers.
Sewage generation is estimated at 28.9 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 35 KLD. Treated water will be reused for flushing and gardening, with any surplus discharged into the AMC drainage line.
Power requirement for the project is estimated at 300 KW, to be supplied by Uttar Gujarat Vij Company Limited (UGVCL). A 250 KVA diesel generator (DG) set is planned for emergency backup. Access to the site is available via the nearby Ambli Railway Station (2.53 km) and Ahmedabad Airport (15.4 km).
Environmental safeguards
The applicant proposes several energy conservation measures, including the use of LED lighting, solar street lights, and 26.61 KW of solar power generation. The building envelope is designed to meet Energy Conservation Building Code (ECBC) requirements, using cantilever balconies for shading and thermal insulation on the roof.
For storm water management, one percolation well is planned to recharge ground water. Solid waste management involves segregating waste at source into dry and wet bins. Biodegradable waste will be processed in an on-site Organic Waste Converter, while recyclable materials will be sold to vendors. A greenbelt of 832.97 square metres is planned, including the planting of 72 trees.
Alabhya site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.7 acres, this one is smaller than 99% of them.
169 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhadaj, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Alabhya — environmental approval granted, 0 m away
- The Altitude — environmental approval granted, 100 m away
- Camellia — environmental approval granted, 250 m away
- Camellia — initial checks, 250 m away
- Residential Building Construction Project Proposed by Millennia Buildworth LLP — under environmental review, 300 m away
- Residential Building Construction Project Proposed by Millennia Buildworth LLP — environmental approval granted, 350 m away
- Residential Building Construction Project Proposed by Millennia Buildworth LLP — cleared for impact study, 350 m away
- Sivesta Retreat — environmental approval granted, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.