Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nila Infrastructures Limited |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹67 crore |
| Village / locality | Khokhara-Mehmadavad |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01723 |
What the filings say
What is planned
Sarovar Solitaire is a proposed residential and commercial redevelopment project in Khokhara, Ahmedabad. The applicant, Nila Infrastructures Limited, plans to develop the project on a plot area of 0.76 hectares (1.87 acres), which is part of a larger 1.59-hectare (3.93-acre) site designated for public housing redevelopment.
The project consists of six blocks (A, B, C, D, E, and F) with a maximum height of 12 floors above ground. According to the layout plan, the development is divided into two parcels:
- Parcel A: Dedicated to Public Housing Scheme (PHC) development, comprising 448 residential units and 14 shops.
- Parcel B: The recipient land development, comprising 273 residential units and 66 shops.
The total unit count across the development is 721 residential units and 80 shops. The buildings will include two basement levels for parking and services. The ground and first floors are primarily designated for commercial use and common amenities, while the upper floors are for residential units.
Layout and design
The site layout includes a central common plot of 831.18 square metres. Access to the blocks is provided via a 7.50-metre wide approach road designed with a 45-tonne load-bearing capacity. The design incorporates specific facilities for disabled access, including a 1.20-metre wide ramp at the ground level and 3.04-metre to 3.20-metre wide pathways with a 1:12 slope.
Common amenities include a health centre (5.30m x 3.50m), an anganwadi (5.50m x 3.50m), and a society common use area. Technical infrastructure includes a 24-square metre electric sub-station and a security cabin.
Water, power and access
During the operation phase, the total water requirement is estimated at 262.87 kilolitres per day (KLD). This includes 245.70 KLD for residential use (based on 150 LPCD for 1,638 occupants), 5.94 KLD for commercial units, 7.5 KLD for visitors, and 3.73 KLD for horticulture. Fresh water requirement will be 177.13 KLD.
Wastewater generation is projected at 207.31 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 230 KLD. Treated wastewater (85.74 KLD) will be reused for flushing and gardening, with the remainder disposed of into the municipal sewer line.
For storm water management, the applicant plans to install two percolation wells for groundwater recharge. The annual recharge is estimated at approximately 3,400 cubic metres.
Environmental safeguards
The project includes a capital provision of ₹1.035 crore for environmental protection measures. Key components of the Environmental Management Plan (EMP) include:
- Air Quality: Regular sprinkling of water for dust suppression during construction and monitoring of ambient air quality during operation.
- Waste Management: Segregation of solid waste into organic and inorganic components. Bio-degradable waste will be converted into compost using an Organic Waste Converter (OWC).
- Greenbelt: A two-phase plantation plan. The first phase involves planting evergreen trees at 3.0-metre intervals, followed by a second row after 18 months at 6.0-metre intervals.
- Fire Safety: Installation of fire extinguishers, wet risers, a 3,00,000-litre underground static water storage tank, and 20,000-litre terrace tanks on each block.
Land and surroundings
Geotechnical investigations conducted at the site involved two boreholes drilled to a depth of 25.0 metres. The sub-soil profile consists of silty sand with debris near the surface, followed by layers of yellowish-brown clayey sand and silty sand with gravels. The groundwater table was encountered at depths ranging from 3.70 to 5.80 metres during the investigation in January 2019.
Sarovar Solitaire site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is larger than 62% of them.
119 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khokhara-Mehmadavad, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Commercial + Residential Building Construction Project proposed by Gujarat… — environmental approval granted, 1000 m away
- 'Lilamani Manchester Park-II' of ASHIMA LIMITED — initial checks, 1.1 km away
- 'Lilamani Manchester Park' of Norfolk Business Private Ltd — lapsed, 1.2 km away
- Lilamani Manchester Park of Norfolk Business Private Limited — environmental approval granted, 1.2 km away
- Aagam Business Centre — environmental approval granted, 1.4 km away
- Proposed Commercial Building Construction Project by Paramount Buildcon — environmental approval granted, 1.4 km away
- Sharanam Navkar — environmental approval granted, 1.4 km away
- L. G. Hospital Campus — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.