Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Jan 2024 |
| Application filed | 29 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Oilmax Energy Private Limited |
| Land area | 3,530.5 acres (1,428.8 ha) |
| Project cost | ₹100 crore |
| Village / locality | Mevad |
| Taluk / tehsil | Mahesana |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01853 |
In context
130 applications in Mahesana since January 2022 are in the same category (Mining): 85 approved, 12 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3,530.5 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Mevad, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Onshore Oil & Gas Production and Development from Mewad Block,… — environmental approval granted, 0 m away
- Onshore drilling of appraisal cum development Of Oil And Gas wells In Mewad… — lapsed, 0 m away
- Expansion for Proposed Project Synthetic Organic Chemicals (Resin-1000… — environmental approval granted, 2.5 km away
- Construction and Development of 192 Residential Quarters and Surrounding Area… — environmental approval granted, 3.3 km away
- APEX DECOR LLP ( Earlier Name : Parista Laminates) — under environmental review, 3.7 km away
- 125mm Dia MDPE Gas Pipeline Connectivity for M/S Mehsana Municipality Muktidham — more information requested, 3.9 km away
- Industrial project by M/s. Ved Enterprise — cleared for impact study, 3.9 km away
- Industrial project by Surface Mica LLP — environmental approval granted, 4.5 km away
More from Oilmax Energy Private Limited in Mahesana
- Proposed Onshore Oil & Gas Production and Development from Mewad Block,… — environmental approval granted
All 18 Oilmax Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.