Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 May 2023 |
| Application filed | 3 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dalsukhbhai Prajapati |
| Land area | 15.1 acres (6.1 ha) |
| Project cost | ₹42 crore |
| Village / locality | Kamlapura |
| Taluk / tehsil | Vaghodia |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01857 |
What the filings say
What is planned
Shantam Meadows is a residential project proposed by Mr. Dalsukh C. Prajapati in Kamlapura village, Vadodara. According to the applicant's project report, the development will consist of two buildings with a total of 422 tenements and 142 studio units. The buildings are designed with a ground floor plus two upper floors (G+2), reaching a maximum height of 9.60 metres.
The project is planned on a plot area of 61,108 square metres (6.11 hectares). The total built-up area is specified as 37,787.45 square metres, with a proposed Floor Space Index (FSI) area of 30,964.88 square metres. Amenities planned for the residents include a club house and a children's play area.
| Item | Detail |
|---|---|
| Total Tenements | 422 |
| Studio Units | 142 |
| Building Configuration | G + 2 |
| Max Building Height | 9.60 m |
| Total Built-up Area | 37,787.45 m² |
| Ground Coverage | 20,430.83 m² |
| Common Plot Area | 9,187 m² |
| Expected Residents | 2,041 |
Layout and design
The layout plan shows the project site bordered by a 24-metre wide existing road on the western side and an 18-metre wide road on the eastern side. Internal roads within the complex are planned to be 6.0 metres wide. The project includes a total parking provision of 3,125 square metres, providing 136 Equivalent Car Spaces (ECS) on the open surface, which exceeds the requirement of 71 ECS calculated under the National Building Code.
Water, power and access
During the operation phase, the total water requirement is estimated at 325 kilolitres per day (KLD). Fresh water of 185 KLD will be sourced from the Gram Panchayat via the Narmada Canal. The project plans to generate 223 KLD of wastewater, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 270 KLD using electrolysis technology. Approximately 140 KLD of treated water will be reused for flushing (94 KLD) and gardening (46 KLD).
Power will be supplied by Madhya Gujarat Vij Company Limited (MGVCL) with a connected load of 3,470 KW and a maximum demand of 2,430 KW. One diesel generator set of 125 kVA is proposed for emergency backup. The project also includes 30 electric vehicle charging points.
Environmental safeguards
The applicant proposes a green belt area of 9,187 square metres, representing 15% of the plot area. This will include a tree-covered area of 3,060 square metres where 1,530 trees of species such as Neem, Ashoka, and Jamun will be planted. For rainwater harvesting, 16 percolation wells are planned.
Renewable energy measures include the installation of 405 solar panels with a total capacity of 176 KW. These are intended to power indoor and outdoor lighting (36 KW), water pumps (20 KW), and electric vehicle charging stations (10 KW). Solid waste management plans include the use of an automatic Organic Waste Convertor (OWC) for 407 kg/day of wet waste, while 816 kg/day of dry waste will be sold to vendors.
Corporate Environment Responsibility
The applicant has budgeted ₹77.5 lakh for Corporate Environment Responsibility (CER) activities over three years. These include:
- Installing 40 high-capacity solar panels at Bapod Primary Health Centre.
- Pond development, including cleaning, dredging, and fencing at Pipaliya village.
- Planting 300 trees with guards and installing 100 solar street lights and 10 rainwater harvesting structures.
Shantam Meadows site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 15.1 acres, this one is larger than 86% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamlapura, Vaghodia, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shrimay Bungalows — lapsed, 2.7 km away
- Forged & Machined Items manufacturing unit with 43000 MTA capacity of SE Forge… — more information requested, 3.1 km away
- Diversion of Protected Forest Land for Widening of Vadodara - Waghodia Road… — lapsed, 4 km away
- 0.2472 Ha. Of Protected Forest Land For the Under Construction of 66 KV S/C,… — more information requested, 6 km away
- Diversion of Protected Forest Land for Vadodara Urban Development Authority… — more information requested, 6.1 km away
- Expansion of Copper Tubes, Copper Alloy Rod, Copper Wires & Copper Alloy Wires… — under environmental review, 6.7 km away
- Environment Clearance for Manufacturing of Copper Tubes, wires & rod at Plot… — environmental approval granted, 6.7 km away
- Environment Clearance for Manufacturing of Copper Tubes, wires & rod at Plot… — cleared for impact study, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.