Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jul 2024 |
| Application filed | 12 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Duroply Industries LTD. |
| Land area | 13.6 acres (5.5 ha) |
| Project cost | ₹117.5 crore |
| Village / locality | Shapur |
| Taluk / tehsil | Kotda Sangani |
| District | Rajkot |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01880 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 13 Aug 2024 | Environmental approval granted | 13.6 acres | ₹117.5 crore |
| Expansion filed 12 Jun 2023 (this page) | Environmental approval granted | 13.6 acres | ₹117.5 crore |
In context
66 applications in Rajkot since January 2022 are in the same category (Industry): 50 approved, 8 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.6 acres, this one is larger than 91% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shapur, Kotda Sangani, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion Project For Manufacturing Of Synthetic Organic Chemicals By… — environmental approval granted, 0 m away
- Change in Product Mix Application Without Increasing Pollution Load for M/S.… — initial checks, 750 m away
- 66kV Both Circuit LILO to 220kV Siddheshwar SS from 66kV… — forest land use approved, 900 m away
- Gas Distribution Network in Gondal & Rajkot Taluka & Surrounding Area — forest land use approved, 900 m away
- 66KV D/C Veraval III - Ribda UG cable line with 1Cx630 sq.mm (6+1) XLPE cable… — forest land use approved, 2.1 km away
- Mining project by M/S Jagtat Stone Crushing CO — environmental approval granted, 2.6 km away
- Proposed Expansion of Synthetic Organic Chemicals (API & API Intermediates)… — cleared for impact study, 3.7 km away
- Shapar-Hadamtala Industrial Connectivity (SHIC):Gas Distribution Network in… — forest land use approved, 4.4 km away