Quick answers
What is this project?
Miyani Building Limestone Mining Project, Survey No. 1/14 P1 & 1/14 P2 is a lapsed mining project in Miyani, Porbandar, Gujarat. The site covers 2.6 acres.
Who is building it?
The applicant is Rajendra Odedra.
Has it been approved?
No. The application was lapsed on 26 Aug 2025, so it is no longer under consideration.
Where is it?
In Miyani, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 2.6 acres.
When was it filed?
The application was filed on 3 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Aug 2025 |
| Application filed | 3 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajendra Odedra |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Miyani |
| Taluk / tehsil | Porbandar |
| District | Porbandar |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-01905 |
In context
144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.6 acres, this one is larger than 55% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 16.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Miyani, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalubhai Valabhai — environmental approval granted, 400 m away
- Munghiben harsdasbhai Odedara — environmental approval granted, 400 m away
- Munghiben Hardasbhai Odedara — returned to applicant, 400 m away
- Munghiben Hardasbhai Odedara — environmental approval granted, 400 m away
- Lalitbhai Rajabhai Bhutiya — initial checks, 400 m away
- Lalitbhai Rajabhai Bhutiya — under environmental review, 400 m away
- Sanjay Savdas Odedara (New) — environmental approval granted, 550 m away
- Miyani Building Limestone mine (Survey no. 1/9/3 P1) — environmental approval granted, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.