Quick answers
What is Satvam Skyline?
Satvam Skyline is an approved building project in Sargasan, Gandhinagar, Gujarat. The site covers 0.8 acres.
Who is building it?
The applicant is Mahalakshmi Buildcon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Aug 2023), as of 27 Nov 2026.
Where is it?
In Sargasan, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹35.5 crore and a site of 0.8 acres.
When was it filed?
The application was filed on 12 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Aug 2023 |
| Application filed | 12 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahalakshmi Buildcon |
| Land area | 3,400 m² |
| Project cost | ₹35.5 crore |
| Village / locality | Sargasan |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01929 |
What the filings say
Mahalakshmi Buildcon is developing Satvam Skyline, a residential and commercial project in Sargasan, Gandhinagar. The applicant's project report describes a development consisting of two blocks, Block A and Block B, rising to 14 floors above ground level. The project is designed to accommodate 123 units in total, comprising 112 residential apartments and 11 commercial shops.
What is planned
The project features two distinct blocks with a combined built-up area of 21,237.46 square metres. Block A is planned with 67 units and Block B with 56 units. The ground floor is dedicated to commercial and utility spaces, including 11 shops, an entry foyer, a gymnasium, and indoor games facilities.
Residential units are distributed from the first to the 14th floor. Each typical floor from the second to the 14th level is designed to house 8 units (4 per block). The first floor differs slightly with 8 units total. A multi-purpose hall is also planned on the ground level of Block B.
| Item | Detail |
|---|---|
| Total Built-up Area | 21,237.46 sq. m. |
| Total Proposed F.S.I. Area | 13,598.98 sq. m. |
| Total Residential Units | 112 |
| Total Commercial Units | 11 |
| Tallest Building Height | 14 Floors |
| Common Plot Area | 351.57 sq. m. |
| Total Parking Provision | 127 Equivalent Car Spaces |
| Estimated Project Cost | ₹35.51 crore |
Layout and design
The site layout includes a central common plot of 351.57 square metres. Access is provided via an 18.00-metre-wide road, with internal peripheral roads of 6.00 metres width to ensure smooth traffic movement. Separate entry and exit gates are planned.
Parking is distributed across two basement levels and ground-level open spaces. The design incorporates two lifts for each block, including dedicated fire lifts. Utility areas such as a meter room, security cabins, and a dedicated space for an Organic Waste Converter (OWC) are integrated into the ground floor plan.
Water, power and access
The project's water management strategy includes a Sewage Treatment Plant (STP) with a capacity of 90 kilolitres per day (KLD). Treated sewage will be reused for flushing and gardening within the premises, with any excess discharged into the municipal drainage line.
For power, the applicant proposes installing a 50 kW rooftop solar system, requiring approximately 500 square metres of terrace space. A Diesel Generator (DG) set with an acoustic enclosure will be provided for emergency backup. Rainwater harvesting will be managed through a collection system and one percolating well.
Environmental safeguards
The applicant has allocated ₹159.31 lakh for capital expenditure on environmental management and ₹10.61 lakh for annual recurring costs. A greenbelt covering 561.57 square metres (16.51% of the plot area) is planned, consisting of a 351.57-square-metre lawn and a 210-square-metre tree plantation area. The plantation program includes 90 trees of native species such as Asopalav, Neem, Gulmohar, and Pipal.
Solid waste management involves source segregation. An automatic OWC with a capacity of 166 kg/day will treat wet waste on-site, while recyclable materials will be disposed of through municipal channels. Dust mitigation measures during construction include 15-foot-high barricading, water sprinkling, and covering construction materials with tarpaulin.
Corporate Environment Responsibility
The applicant has proposed a budget of ₹71.00 lakh (2% of the project cost) for Corporate Environment Responsibility (CER) activities over three years. These activities are focused on Uvarsad village, located approximately 5.15 km from the site. Planned works include the installation of 12 kW solar rooftop systems at the Gram Panchayat, Primary Health Centre, and Post Office, as well as the beautification and redevelopment of the Uvarsad village lake, covering 12,472 square metres.
Satvam Skyline site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 94% of them.
168 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sargasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Imperial Heights — environmental approval granted, 100 m away
- Ocean Sky — environmental approval granted, 150 m away
- Swagat Glassglow — environmental approval granted, 400 m away
- Embrace The Wind — environmental approval granted, 450 m away
- Embrace The Wind — environmental approval granted, 450 m away
- 1352 EWS-ii Residential Flats Including Infrastructure Development Under PMAY — environmental approval granted, 500 m away
- Palasa Residency — environmental approval granted, 550 m away
- Shikshapatri Sky Light — environmental approval granted, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.