Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Mar 2023 |
| Application filed | 22 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Pankajkumar Patel |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹89.8 crore |
| Village / locality | Ghuma |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01989 |
What the filings say
What is planned
Pankajkumar Patel proposes 'Mansi Empire', a residential and commercial project in Ghuma, Ahmadabad. The applicant's project report describes a development consisting of seven blocks (A to G) with a maximum height of 14 floors above ground level. The project includes two basement levels for parking and services.
The project will provide a total of 388 units, comprising:
- 330 residential units
- 58 commercial shops
Project Components
| Item | Detail |
|---|---|
| Total Plot Area | 0.7 hectares (1.73 acres) |
| Net Plot Area | 7,033.86 square metres |
| Total Utilised F.S.I. Area | 27,973.54 square metres |
| Ground Coverage | 2,925.73 square metres |
| Maximum Floors | 14 Floors + 2 Basements |
| Total Units | 388 (330 Residential, 58 Shops) |
| Estimated Excavation | 45,000 cubic metres |
Layout and design
The layout features seven distinct blocks arranged around a central common plot of 704.45 square metres. Blocks A, B, and C are grouped together, as are Blocks D and E. Block F and Block G are separate structures. The ground floor is designated for commercial shops and society offices, while the upper floors are for residential use.
Parking is distributed across the ground level and two basement floors. The project includes a 6.00-metre-wide internal approach road and a 3.20-metre-wide walkway. The site is bordered by an 18.00-metre-wide Town Planning Scheme (T.P.S.) road.
Water, power and access
The total water requirement for the project is estimated at 212.05 kilolitres per day (KLD). Fresh water demand of 124.55 KLD will be sourced from the Ahmedabad Municipal Corporation (AMC), while 87.5 KLD will be met through recycled water from an on-site Sewage Treatment Plant (STP). The STP will have a capacity of 225 cubic metres per day.
Power will be sourced from the local grid. For emergency backup, diesel generator (DG) sets will be installed with acoustic enclosures. The applicant plans to install solar photo-voltaic panels on the rooftops with a calculated capacity of 135 kW. Additionally, the project will feature electric vehicle (EV) charging infrastructure with approximately 50 charging points and an additional power provision of 250 kW.
Environmental safeguards
The applicant proposes several mitigation measures to manage environmental impact:
- Waste Management: Total solid waste generation is estimated at 703.5 kg/day. Organic waste will be processed on-site using an Organic Waste Composter (OWC) with a 300 kg/day capacity. The resulting manure will be used for landscaping.
- Rainwater Harvesting: Two percolation wells are planned to recharge groundwater, based on a requirement of one well per 4,000 square metres of land.
- Greenbelt: A total of 920 square metres (13% of the plot area) is earmarked for greenbelt development. This includes 560 square metres of lawn and 360 square metres for trees. The applicant plans to plant 176 trees, including species such as Neem, Gulmohar, and Peepal.
- Air and Noise: Dust suppression through water sprinkling and barricades is planned for the construction phase. DG sets will be equipped with stacks of at least 3.5 metres height from the roof level.
Corporate Environmental Responsibility
The applicant has earmarked ₹179.6 lakh (2% of the project cost) for Corporate Environmental Responsibility (CER) activities over five years. Proposed works include the development of the Ratna Lake village pond in Telav-Ghuma, road-side tree plantation, installation of solar panels at Shela Primary School, and providing solar streetlights in Godhavi village.
Residential and Commercial Project - 'Mansi Empire' site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.7 acres, this one is larger than 57% of them.
209 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghuma, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential and Commercial Project - 'IMPERIAL-2' by Shaileshbhai… — more information requested, 150 m away
- Skyline — under environmental review, 300 m away
- Skyline — environmental approval granted, 300 m away
- Skyline — withdrawn, 300 m away
- Skyline — environmental approval granted, 300 m away
- Mahadev Glory — environmental approval granted, 350 m away
- Aastha Avirat — environmental approval granted, 400 m away
- Elenza Vibe — environmental approval granted, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.