Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Mar 2023 |
| Application filed | 4 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Narsinhbhai Asari |
| Land area | 3,700 m² |
| Project cost | ₹31 crore |
| Village / locality | Thaltej |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02080 |
What the filings say
What is planned
Muktidham is a proposed mixed-use development comprising commercial and residential components. The applicant, Narsinhbhai Asari, intends to construct two distinct blocks on a plot area of 0.37 hectares (0.91 acres).
According to the project documents, the development will include:
- Block A: A commercial-cum-residential building featuring 22 shops and 44 residential units. This block is planned with two cellar levels for parking, a ground floor for shops, and 13 upper floors.
- Block B: A residential building with 56 units, also featuring two cellar levels, a hollow plinth for parking, and 14 upper floors.
The project totals 100 residential units and 22 shops. Residential units are primarily planned as four-bedroom apartments. The total built-up area for the project is 9,697.65 square metres.
Layout and design
The site layout includes a common plot area of 366.06 square metres. The buildings are designed with a maximum height of approximately 50.50 metres. Block A is positioned towards the front of the site with commercial frontage, while Block B is situated behind it.
Parking is distributed across two basement levels and surface areas. The project proponent has planned for 217 car parking spaces, exceeding the National Building Code requirement of 122 spaces. This includes 86 spaces in the first basement, 83 in the second basement, and 48 spaces at the surface and hollow plinth levels.
Internal circulation is facilitated by 6-metre wide roads to allow for the movement of emergency vehicles. The project includes dedicated entry and exit points to manage traffic flow.
Land and surroundings
The project is located in Thaltej, Ahmadabad, on Final Plot No. 39. The site is bordered by existing final plots and is accessible via a 60-metre wide S.G. Highway and a 12-metre wide Town Planning Scheme (TPS) road. The surrounding area is designated as a Residential I (R1) zone. The applicant plans to develop a greenbelt covering 92 trees and lawn areas to improve local air quality and provide a noise buffer.
Water, power and access
During the construction phase, water will be sourced from local tanker suppliers. For the operation phase, the Ahmadabad Municipal Corporation (AMC) will provide the water supply. A sewage treatment plant (STP) with a capacity of 110 kilolitres per day (KLD) using the Activated Sludge Process is planned. Treated water will be reused for gardening and toilet flushing, with any excess discharged into the AMC drainage line.
Power will be sourced from the local grid, supplemented by a 45.81 kW rooftop solar energy system. Emergency power backup will be provided by a diesel generator (DG) set equipped with acoustic enclosures and an adequate stack height.
Environmental safeguards
The Environmental Management Plan (EMP) includes a capital expenditure of ₹156.1 lakh. Key safeguards include:
- Waste Management: An automatic organic waste converter (OWC) will process approximately 178.5 kg/day of wet waste into compost for the greenbelt. Dry waste will be collected by the AMC.
- Rainwater Harvesting: One percolation well is proposed to recharge the groundwater table.
- Air and Noise: Dust mitigation measures such as 10-metre high wind-breakers and water sprinkling will be used during construction. The buildings will use non-reflective glass for at least 50% of the external facade.
- Fire Safety: Systems include a 1,00,000-litre underground water tank, a 20,000-litre terrace tank, hydrants, sprinklers, and fire lifts with automatic grounding.
| Item | Detail |
|---|---|
| Total Built-up Area | 9,697.65 sq. m. |
| F.S.I. Area | 7,657.87 sq. m. |
| Residential Units | 100 |
| Commercial Shops | 22 |
| Parking Spaces | 217 |
| STP Capacity | 110 KLD |
| Solar Power | 45.81 kW |
| Greenbelt Trees | 92 |
| EMP Capital Cost | ₹1.56 crore |
Muktidham site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 89% of them.
265 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thaltej, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Project – "Shree Vishnudhara Essence" by M/s. Vishnudhara… — environmental approval granted, 250 m away
- Healthcity, Ahmedabad — environmental approval granted, 250 m away
- Healthcity, Ahmedabad — cleared for impact study, 250 m away
- Healthcity, Ahmedabad (Expansion of Hospital and Medical College) — lapsed, 250 m away
- Healthcity, Ahmedabad (Expansion of Hospital and Medical College) — cleared for impact study, 250 m away
- Anusthan Projects — environmental approval granted, 250 m away
- Swapna Apartments — environmental approval granted, 300 m away
- One 91 Thaltej — under environmental review, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.