One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. Gopinath Enterprise
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Jul 2023 |
| Application filed | 14 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mitulkumar Patel |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Jambu Goral |
| Taluk / tehsil | Desar |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02090 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Feb 2025 | Environmental approval granted | 3.6 acres | ₹3.5 crore |
| Early planning filed 14 Jul 2023 (this page) | Cleared for impact study | 3.6 acres | ₹3.5 crore |
In context
297 applications in Vadodara since January 2022 are in the same category (Mining): 133 approved, 57 filed or under review, and 107 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.6 acres, this one is smaller than 74% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 18.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 39 mining leases have applied within 5 km.
Where it is
Jambu Goral, Desar, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Gopinath Enterprise — environmental approval granted, 0 m away
- Mining project by M/s Shivam Stone Crusher, Re-appraisal Area-00.84.87 Survey… — environmental approval granted, 200 m away
- Ram Hardas Mulu (Jambugoral Blacktrap Mining Area) — under environmental review, 250 m away
- SHIV SHAKTI QUARRY PRIVATE LIMITED (JAMBUGORAL BLACKTRAP MINING AREA 2.48.88 Ha) — under environmental review, 400 m away
- Shri Balubhai Hathibhai Rathod — under environmental review, 450 m away
- Shri Balubhai Hathibhai Rathod — cleared for impact study, 450 m away
- Shiv Shakti Quarry Private Limited (Jambugoral Blacktrap Block-P6) — under environmental review, 600 m away
- Vipulkumar Lakhmanbhai Ravaliya (Jambugoral Blacktrap Block-P4) — under environmental review, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.