Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Oct 2023 |
| Application filed | 6 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dwarkesh Enterprise |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹54.5 crore |
| Village / locality | Bil |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02100 |
What the filings say
What is planned
Dwarkesh Enterprise proposes to develop Gokulesh Tulip, a high-rise residential and commercial complex in Bil, Vadodara. The project report describes a development consisting of five residential blocks (A1, A2, A3, B, and C) and commercial units. The residential component will provide 220 units, while the commercial component will include 44 units.
The residential towers are designed with a basement, ground floor, and 11 upper floors. The commercial units are located on the ground floor. The project has a total plot area of 8,608 square metres and a total built-up area of 34,424.32 square metres.
Unit Details
- Residential: 220 units, primarily 3BHK and 4BHK configurations. Tower A1, A2, and A3 contain 3BHK units with a carpet area of approximately 83.26 square metres. Tower B features 3BHK units of 87.60 square metres, and Tower C contains 4BHK units of 105.83 square metres.
- Commercial: 44 shops located on the ground floor, with individual carpet areas ranging from approximately 9.57 square metres to 56.59 square metres.
Layout and Design
The ground floor layout includes a common plot area of 861.26 square metres. The buildings are arranged around internal approach roads of 6 metres and 4 metres in width. The residential towers feature lobbies, multiple lifts (typically two per tower), and staircases. The commercial shops are positioned along the periphery, facing the 20-metre and 18-metre wide Town Planning Scheme (TPS) roads.
Parking is distributed across the basement and ground levels. The basement provides 5,938.27 square metres of parking space, while the ground floor includes 2,652.87 square metres of covered and open parking areas, for a total parking provision of 8,591.14 square metres.
Water, Power and Access
During the construction phase, water will be sourced from tankers. For the operational phase, the applicant intends to use a borewell. Total water consumption is estimated at 148 kilolitres per day (KLD), comprising 93.5 KLD of fresh water and 54.5 KLD of recycled water. Wastewater generation is projected at 122 KLD.
Power will be supplied by Uttar Gujarat Vij Company Limited (UGVCL), with a total requirement of approximately 1,500 KW. A 160 KVA diesel generator set is planned as a standby power source for emergencies. Access to the site is provided via an 18-metre wide TPS road.
Environmental Safeguards
The applicant proposes an in-house Sewage Treatment Plant (STP) with a capacity of 140 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (50 KLD) and gardening (4.5 KLD), with the remaining 67.5 KLD discharged into the Vadodara Municipal Corporation (VMC) drainage system.
For solid waste, an automatic Organic Waste Convertor (OWC) will handle approximately 325 kg of biodegradable waste per day. Non-biodegradable waste will be sold to vendors. Rainwater harvesting will be managed through two percolation wells to recharge ground aquifers. The project includes a greenbelt area of 862 square metres, with plans to plant 170 trees. Additionally, the applicant plans to install a 75 KW rooftop solar system.
| Item | Detail |
|---|---|
| Total Built-up Area | 34,424.32 sq.m. |
| Total F.S.I. Area | 23,101.46 sq.m. |
| Residential Units | 220 |
| Commercial Units | 44 |
| Total Parking Area | 8,591.14 sq.m. |
| STP Capacity | 140 KLD |
| Greenbelt Area | 862 sq.m. |
| Power Requirement | 1,500 KW |
| Solar Power Capacity | 75 KW |
Gokulesh Tulip site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.1 acres, this one is larger than 52% of them.
52 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bil, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pratham Riviera — returned to applicant, 550 m away
- Karma Heights — environmental approval granted, 1.2 km away
- Proposed Commercial Project "VS Monolith" — lapsed, 1.4 km away
- Everest Dignity-III — environmental approval granted, 2 km away
- Aamrapali Luxuria — environmental approval granted, 2.2 km away
- Trinetra by Courtyard — environmental approval granted, 2.2 km away
- Residential and Commercial Building Construction Project Proposed by Samasta… — returned to applicant, 2.3 km away
- Residential and Commercial Building Construction Project Proposed by Samasta… — environmental approval granted, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.