One of 2 filings for this project. The project's main page, with every filing and where each stands: Change in Product Mix for Alembic Pharmaceuticals Ltd., API Unit – 3, Village Karkhadi,…
Project details
| Status | Initial checks |
|---|---|
| Status since | 6 Sept 2023 |
| Application filed | 6 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Alembic Pharmaceuticals Limited Api Unit III |
| Use | Industrial |
| Land area | 26.9 acres (10.9 ha) |
| Project cost | ₹437.8 crore |
| Village / locality | Karkhadi |
| Taluk / tehsil | Padra |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02121 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Oct 2024 | Initial checks | 26.9 acres | ₹540.2 crore |
| New project filed 6 Sept 2023 (this page) | Initial checks | 26.9 acres | ₹437.8 crore |
In context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 26.9 acres, this one is larger than 91% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karkhadi, Padra, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in Product Mix for Alembic Pharmaceuticals Ltd., API Unit – 3, Village… — initial checks, 50 m away
- Change in Product Mix for M/s. Neogen Chemicals Ltd. — initial checks, 650 m away
- Industrial project by M/s. Neogen Chemicals Ltd. — initial checks, 650 m away
- Industrial project by Shiva Performance Materials Pvt. Ltd. — environmental approval granted, 900 m away
- Proposed Expansion In Existing Unit of M/s. Shiva Performance Materials Pvt.… — environmental approval granted, 900 m away
- Project by M/s. S. D. Intermediates — initial checks, 1.7 km away
- Expansion of Pigments Manufacturing Unit — environmental approval granted, 2.1 km away
- Choksi Colours Pvt. Ltd. (Unit II) — initial checks, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.