Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Umeshkumar Patel |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹41 crore |
| Village / locality | Jhadeshwar |
| Taluk / tehsil | Bharuch |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02282 |
What the filings say
What is planned
Aries Signature is a proposed residential development consisting of four towers, designated as Tower A, Tower B, Tower C, and Tower D. According to the applicant's project report and conceptual plans, each of the four towers will be built with a basement, a ground floor, and 12 upper floors, followed by a terrace level.
The project is designed to provide residential units with a total built-up area of 33,536.75 square metres. The Floor Space Index (F.S.I.) area consumed for the development is 22,025.55 square metres, representing an F.S.I. of 2.70. The towers are supported by common amenities and two security cabins located at the site entrances.
Layout and design
The project is situated on a total land area of 10,200 square metres, which includes a land contribution area of 2,040 square metres. This leaves a net plot area of 8,160 square metres (2.02 acres). The layout features a central common plot of 1,364.62 square metres, which includes 204.18 square metres of common amenity space.
Parking is planned across the basement and ground levels. The total proposed parking area is 5,633.56 square metres, significantly exceeding the required 4,405.11 square metres. This includes a large basement parking facility of 4,677.48 square metres and dedicated ground-level parking spaces for each tower. For visitors, the applicant has allocated 956.08 square metres of parking space.
| Item | Detail |
|---|---|
| Net Plot Area | 8,160 sq.m. (2.02 acres) |
| Total Built-up Area | 33,536.75 sq.m. |
| Total F.S.I. Area | 22,025.55 sq.m. |
| Number of Towers | 4 |
| Maximum Floors | Basement + Ground + 12 |
| Proposed Parking Area | 5,633.56 sq.m. |
| Green Belt Area | 1,362.84 sq.m. |
| Solar Power Capacity | 95 KW |
| Estimated Completion | 4 Years |
Water, power and access
The project will generate domestic sewage, which the applicant proposes to discharge into the Bharuch Ankleshwar Urban Development Authority (BAUDA) drainage system for further treatment and final disposal. The Environmental Management Plan (EMP) also specifies the installation of an 110 kilolitres per day (KLD) Moving Bed Biofilm Reactor (MBBR) type sewage treatment plant.
Power requirements will be partially met by a 95 KW rooftop solar energy system, which will occupy 570 square metres of terrace space. Diesel Generator (DG) sets will be maintained on-site for emergency operations and power failures. Access to the site is provided via an 18.00-metre wide road.
Environmental safeguards
The applicant has planned a green belt covering 1,362.84 square metres, or 16.70% of the plot area. This includes 362.84 square metres of tree-covered area and 1,000 square metres of lawn. A total of 130 trees are to be planted, featuring species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
For waste management, the project will use an automatic organic waste converter with a capacity of 300 kg per day to handle non-hazardous garbage. Rainwater harvesting will be managed through a collection system and two percolation wells. The total capital cost for environmental management is estimated at ₹2.32 crore, with an annual recurring cost of ₹19.70 lakh.
Timeline
The applicant's project report states that the entire project is expected to be completed within approximately four years. The installation of environmental management units will proceed in parallel with the building construction.
Aries Signature site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
58 applications in Bharuch since January 2022 are in the same category (Buildings & townships): 34 approved, 12 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 58% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhadeshwar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shivalik Rivera — environmental approval granted, 1 km away
- R.K. Celestial — environmental approval granted, 1.4 km away
- New Road GNFC Cross Road To Adjoining To Tavara TP Road 0/0-2/5 — lapsed, 1.6 km away
- Atharv Green — environmental approval granted, 1.7 km away
- Sai Paradise — more information requested, 1.8 km away
- 7X Luxuria — environmental approval granted, 1.8 km away
- Celebration Homes — environmental approval granted, 1.8 km away
- Aarambh Alenza — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.