Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Oct 2023 |
| Application filed | 20 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mukeshbhai Vichiya |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Ghandla |
| Taluk / tehsil | Savar Kundla |
| District | Amreli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02306 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Apr 2025 | Lapsed | 9.9 acres | ₹64 lakh |
| Early planning filed 20 Oct 2023 (this page) | Cleared for impact study | 9.9 acres | ₹64 lakh |
In context
123 applications in Amreli since January 2022 are in the same category (Mining): 63 approved, 20 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 9.9 acres, this one is larger than 89% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 19.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Ghandla, Savar Kundla, Amreli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mukeshbhai Vasurbhai Vinchiya(Block-D) — lapsed, 0 m away
- Mukeshbhai Vasurbhai Vinchiya (Block-F ) — not approved, 350 m away
- Mukeshbhai Vasurbhai Vinchiya (Block-F ) — cleared for impact study, 350 m away
- River Sand Mining Project — not approved, 600 m away
- River Sand Mining Project — cleared for impact study, 650 m away
- Proposed M/s Hitendrasinh Jayvantsinh Sarvaiya,Ghandla Ordinary Sand Block… — not approved, 850 m away
- Proposed M/s Hitendrasinh Jayvantsinh Sarvaiya,Ghandla Ordinary Sand Block… — not approved, 1.2 km away
- Proposed Blacktrap mining project Blacktrap Mine Block-A located at Bhammar… — cleared for impact study, 3.6 km away
More from Mukeshbhai Vichiya in Amreli
- Mukeshbhai Vasurbhai Vinchiya (Block-F ) — not approved
- River Sand Mining Project — not approved
- Mukeshbhai Vasurbhai Vinchiya (Block-F ) — cleared for impact study
- River Sand Mining Project — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.