Project details
| Official title | Establishment of Proposed Synthetic Organic Chemicals Manufacturing Plant Within The Existing Inorganic Manufacturing Plant of M/s. Kedar Phyto Pvt. Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Aug 2025 |
| Application filed | 4 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kedar Phyto Private Limited |
| Land area | 1,300 m² |
| Project cost | ₹6.6 crore |
| Village / locality | Mirjapur |
| Taluk / tehsil | Kathlal |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02909 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Dec 2024 (this page) | Environmental approval granted | 0.3 acres | ₹6.6 crore |
| Early planning filed 1 Jun 2024 | Cleared for impact study | 0.3 acres | ₹6.6 crore |
In context
36 applications in Kheda since January 2022 are in the same category (Industry): 26 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 94% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mirjapur, Kathlal, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals Manufacturing Plant Within The Existing… — cleared for impact study, 0 m away
- 125mm Extension of PE Gas Pipeline to Supply Industrial Customers of Fabtech… — forest land use approved, 4.5 km away
- Shri Kanjibhai Devajibhai Rabari Reapprasial Area-2.00.00 Vatrak Nadi Patt,… — environmental approval granted, 5.3 km away
- 90 Dia. PE Gas pipeline Connectivity For Yash Petroleum Village Haldharvas,… — forest land use approved, 6.2 km away
- Diversion of Protected Forest Land (Area - 0.60 Ha) for the Non forest purpose… — lapsed, 6.3 km away
- Arvindbhai Rohitkumar Parmar (Haldarvas Ordinary Sand Block No- E) — under environmental review, 6.9 km away
- Shri Arvindbhai Rohitkumar Parmar — returned to applicant, 6.9 km away
- Udabhai Sukhabhai Zala ( Haldarvas Ordinary Sand Block - F) — cleared for impact study, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.