Quick answers
What is Shri Vanubhai Kishorbhai Dhadhal?
Shri Vanubhai Kishorbhai Dhadhal is an approved mining project in Bhimora, Chotila, Surendranagar, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Vanubhai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Dec 2024), as of 27 Nov 2026.
Where is it?
In Bhimora, Chotila, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 27 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Dec 2024 |
| Application filed | 27 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vanubhai |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Bhimora |
| Taluk / tehsil | Chotila |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02988 |
In context
271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 55% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 12.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Bhimora, Chotila, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Dhadhal Raghuvirbhai Gabharubhai Block-A — environmental approval granted, 350 m away
- Shri randir Bechubhai Baradiya — withdrawn, 350 m away
- Permission for Laying Drinking Water Pipeline in 0.7492 Ha. Forest Land for… — forest land use approved, 2.3 km away
- Proposed Expansion of Tsdf-Landfill Within an Integrated Common Haz. Waste… — environmental approval granted, 4.3 km away
- Proposed Expansion of Tsdf-Landfill Within an Integrated Common Haz. Waste… — lapsed, 4.3 km away
- Permission for Laying Drinking Water Pipeline in 0.075 Ha. Protected Forest… — more information requested, 6.3 km away
- Noc for 0.033 Ha. Entry/Exit Approach Road for Access to Petrol Pump on… — more information requested, 9.3 km away
- Permission for laying 150mm/200 mm underground pipeline for drainage and… — more information requested, 10.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.