Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 29 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Saurashtra Cement Limited |
| Land area | 128.3 acres (51.9 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Bhetali |
| Taluk / tehsil | Patan-Veraval |
| District | Gir Somnath |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03046 |
In context
235 applications in Gir Somnath since January 2022 are in the same category (Mining): 128 approved, 59 filed or under review, and 48 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 128.3 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Bhetali, Patan-Veraval, Gir Somnath, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement in Limestone Production Capacity from 0.144 Million Tonnes Per… — under environmental review, 0 m away
- Enhancement in Limestone Production Capacity from 0.144 Million Tonnes Per… — cleared for impact study, 0 m away
- Application for EC transfer from M/s Bharat Chemical Industries to M/s.… — environmental approval granted, 0 m away
- Enhancement in Limestone Production Capacity from 0.144 Million Tonnes Per… — cleared for impact study, 650 m away
- Kodidra Block Mining Lease for Limestone and Marl Mineral for 1.5 million TPA… — environmental approval granted, 1.2 km away
- Kodidra Block Mining Lease for Limestone and Marl Mineral for 1.5 million TPA… — cleared for impact study, 1.2 km away
- Vadodariya Rasikbhai Babubhai, Kukaras Block(Gov) Limestone & Marl Mineral for… — more information requested, 1.4 km away
- Kukaras Block (Private) Mining Lease for Limestone and Marl Mineral for 2.0… — environmental approval granted, 1.8 km away
More from Saurashtra Cement Limited in Gir Somnath
- Enhancement in Limestone Production Capacity from 0.144 Million Tonnes Per… — under environmental review
- Enhancement in Limestone Production Capacity from 0.144 Million Tonnes Per… — cleared for impact study
- Enhancement in Limestone Production Capacity from 0.144 Million Tonnes Per… — cleared for impact study
- Application for EC transfer from M/s Bharat Chemical Industries to M/s.… — environmental approval granted
All 5 Saurashtra Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.