Quick answers
What is Shyam Yamuna?
Shyam Yamuna is an approved residential project in Pasodara, Kamrej, Surat, Gujarat. It plans 280 units in 5 towers of up to 14 floors on 1.4 acres.
Who is building it?
The applicant is Vekariya Mansukhbhai Kalabhai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Feb 2025), as of 27 Nov 2026.
Where is it?
In Pasodara, Kamrej, Surat, Gujarat.
How big is it?
It has a stated cost of ₹41.9 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 21 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Feb 2025 |
| Application filed | 21 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vekariya Mansukhbhai Kalabhai |
| Use | Residential |
| Units | 280 |
| Towers | 5 |
| Floors (tallest) | 14 |
| Basements | 1 |
| Height | 45 m |
| Parking spaces | 293 |
| Land area | 1.4 acres (0.6 ha) |
| Built-up area | 28,994 m² (3,12,089 sq ft) |
| Plot area | 5,464 m² (58,814 sq ft) |
| Project cost | ₹41.9 crore |
| Village / locality | Pasodara |
| Taluk / tehsil | Kamrej |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03078 |
What the filings say
What is planned
Shyam Yamuna is a proposed residential building project by Vekariya Mansukhbhai Kalabhai in Pasodara, Surat. According to the applicant's conceptual plan, the development will consist of five residential buildings, designated as Blocks A, B, C, D, and E. Each building is designed with two basement levels, a hollow plinth, and 14 upper floors.
The project will provide a total of 280 residential units. The total built-up area is planned at 28,993.70 square metres on a plot area of 5,464.00 square metres. Planned amenities for residents include a clubhouse, a garden with a jogging track, and a children's play area.
| Item | Detail |
|---|---|
| Total Residential Units | 280 |
| Number of Buildings | 5 |
| Floors per Building | 2 Basement + Hollow Plinth + 14 Floors |
| Total Built-up Area | 28,993.70 sq. mt. |
| FSI Area | 18,380.71 sq. mt. |
| Maximum Building Height | 44.97 metres |
| Expected Residents | 1,400 |
Layout and design
The site layout features the five blocks arranged around a central common plot (COP) area of 566.14 square metres. Access to the complex will be provided through two gates on a 24-metre wide adjacent public road. Internal roads are planned with a width of 7 metres.
Parking is distributed across the basement, hollow plinth, and open areas. The total proposed parking area is 5,673.98 square metres, providing space for 293 Equivalent Car Spaces (ECS). This includes 214 spaces in the basement and 79 in the hollow plinth. Provisions for 60 electric vehicle charging points are also included in the design.
Water, power and access
The Surat Municipal Corporation (SMC) will be the primary source of water for the project. During the operation phase, the total water requirement is estimated at 199 kilolitres per day (KLD). Of this, fresh water demand is 118 KLD, while 81 KLD will be met through recycled treated water for flushing (78 KLD) and gardening (3 KLD).
Power will be sourced from Dakshin Gujarat Vij Company Limited (DGVCL) with an estimated connected load of 1,600 kW and a maximum demand of 1,500 kW. For emergency backup, the applicant proposes three silent diesel generator sets of 125 kVA each. Energy conservation measures include the installation of 278 solar panels with a total capacity of 150 kW, intended to power common area lighting and water pumps.
Environmental safeguards
A Sewage Treatment Plant (STP) using Moving Bed Biofilm Reactor (MBBR) technology with a capacity of 190 KLD will be installed to treat domestic wastewater. Treated sewage will be discharged into the SMC drainage line after internal reuse. For solid waste, an organic waste convertor with a capacity of 200 kg/day will process wet waste on-site, while dry waste will be collected by the municipal authority.
Rainwater harvesting will be managed through two percolation wells reaching a depth of 40 metres. The project includes a green belt development plan covering 600 square metres, which will feature 137 large trees such as Gul mohar, Jambu, and Badam, along with 30 smaller trees and shrubs.
Timeline
In an undertaking filed in June 2024, the applicant stated that no construction activity had started at the site. The project report notes that existing structures on the plot will be demolished before new construction begins. The estimated project cost is ₹41.88 crore.
Shyam Yamuna site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 60% of them.
137 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pasodara, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nilkanth Vatika — environmental approval granted, 600 m away
- Sankalp Heights — environmental approval granted, 650 m away
- Shivant Antara — environmental approval granted, 1.1 km away
- Harikrushna Vistas — environmental approval granted, 1.1 km away
- Infinity Baug — environmental approval granted, 1.1 km away
- Kedar — environmental approval granted, 1.1 km away
- Royal Pratishtha — environmental approval granted, 1.2 km away
- Shivant — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.