Quick answers
What is this project?
Adityana Chalk Mining Project, Survey No. 190/35, 156 Paiki, Proposed by Shri Nitin Kumar Dolatray Chhelavada is a lapsed mining project in Adityana (Ct), Ranavav, Porbandar, Gujarat. The site covers 8.3 acres.
Who is building it?
The applicant is Nitinkumar Chhelavda.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Adityana (Ct), Ranavav, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 8.3 acres.
When was it filed?
The application was filed on 1 Apr 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 1 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nitinkumar Chhelavda |
| Land area | 8.3 acres (3.3 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Adityana (Ct) |
| Taluk / tehsil | Ranavav |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03082 |
In context
144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.3 acres, this one is larger than 91% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 19.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Adityana (Ct), Ranavav, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Adityana Chalk Mining Project, Survey No. 143/1 Proposed By: Shri Vinodkumar… — lapsed, 450 m away
- Adityana Chalk Mining Project, Survey No. 146 & 147, Proposed by M/s P.… — lapsed, 450 m away
- Adityana Chalk Mining Project, Survey No. 150, Proposed by M/s Shreenathji… — lapsed, 600 m away
- Adityana Chalk Mining Project, Survey No. 144 & 145/2 Proposed By M/s P.… — lapsed, 600 m away
- Adityana Chalk Mining Project, Survey No. 193/1/1, Proposed by Shri Petha… — lapsed, 700 m away
- Adityana Chalk Mining Project, Survey No 135/3, Proposed by M/s Dipak Minerals — lapsed, 700 m away
- Adityana Chalk Mining Project, Survey No. 194 (P), Proposed by Shri Dayalal… — lapsed, 800 m away
- Adityana Chalk Mining Project, Survey No. 178, 183/1, 183/2/1, 183/2/2, 184/1,… — lapsed, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.